11.07.2015 Views

Asphalt Overlay of CDC Roads - Clark Freeport Zone

Asphalt Overlay of CDC Roads - Clark Freeport Zone

Asphalt Overlay of CDC Roads - Clark Freeport Zone

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(c)(d)(e)(f)(g)(h)(i)(j)Having made an estimate <strong>of</strong> the facilities available and neededfor the contract to be bid, if any; andHaving complied with its responsibility to inquire or secureSupplemental/Bid Bulletin/s as provided under ITB Clause 10.3.Ensuring that it is not “blacklisted” or barred from bidding by theGOP or any <strong>of</strong> its agencies, <strong>of</strong>fices, corporations, or LGUs,including foreign government/foreign or international financinginstitution whose blacklisting rules have been recognized by theGPPB;Ensuring that each <strong>of</strong> the documents submitted in satisfaction <strong>of</strong>the bidding requirements is an authentic copy <strong>of</strong> the original,complete, and all statements and information providedtherein are true and correct;Authorizing the Head <strong>of</strong> the Procuring Entity or its dulyauthorized representative/s to verify all the documentssubmitted;Ensuring that the signatory is the duly authorized representative<strong>of</strong> the Bidder, and granted full power and authority to do,execute and perform any and all acts necessary and/or torepresent the Bidder in the bidding, with the duly notarizedSecretary’s Certificate attesting to such fact, if the Bidder is acorporation, partnership, cooperative, or joint venture;Complying with the disclosure provision under Section 47 <strong>of</strong> theAct in relation to other provisions <strong>of</strong> Republic Act 3019; andComplying with existing labor laws and standards, in the case <strong>of</strong>procurement <strong>of</strong> services.Failure to observe any <strong>of</strong> the above responsibilities shall be at the risk<strong>of</strong> the Bidder concerned.6.3. The Bidder, by the act <strong>of</strong> submitting its bid, shall be deemed to haveinspected the site and determined the general characteristics <strong>of</strong> thecontract works and the conditions for this Project. Unless otherwiseindicated in the BDS, failure to furnish all information ordocumentation required in this Bidding Documents shall result in therejection <strong>of</strong> the bid and the disqualification <strong>of</strong> the Bidder.6.4. It shall be the sole responsibility <strong>of</strong> the prospective bidder to determineand to satisfy itself by such means as it considers necessary ordesirable as to all matters pertaining to this Project, including: (a) thelocation and the nature <strong>of</strong> the contract, project, or work; (b) climaticconditions; (c) transportation facilities; (c) nature and condition <strong>of</strong> the12<strong>Clark</strong> Development CorporationSection II Instructions to Bidders<strong>Asphalt</strong> <strong>Overlay</strong> <strong>of</strong> <strong>CDC</strong> <strong>Roads</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!