11.07.2015 Views

Giardino Series Installation.pdf - Forno Bravo

Giardino Series Installation.pdf - Forno Bravo

Giardino Series Installation.pdf - Forno Bravo

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Giardino</strong> <strong>Installation</strong> and Operating Manualthinner than 26 gage in thickness or non combustible sheetmaterial not more thicker than 1/2 in.non-water soluble refractory cement. Use this cement toalso seal to the brick masonry penetration.If it is necessary to pass through combustible walls toconnect the oven to a chimney liner, the followingclearances must be maintained.Method A. 12” (304.8 mm) Clearance to Combustible WallMember: Using a minimum thickness 3.5” (89 mm) brickand a 5/8” (15.9 mm) minimum wall thickness clay liner,construct a wall pass-through. The clay liner must conformto ASTM C315 (Standard Specification for Clay FireLinings) or its equivalent. Keep a minimum of 12” (304.8mm) of brick masonry between the clay liner and wallcombustibles. The clay liner shall run from the brickmasonry outer surface to the inner surface of the chimneyflue liner but not past the inner surface. Firmly grout orcement the clay liner in place to the chimney flue liner.Method B. 9” (228.6 mm) Clearance to Combustible WallMember: Using a 6” (152.4 mm) inside diameter, listedfactory-built Solid-Pak chimney section with insulation of1” (25.4 mm) or more, build a wall pass-through with aminimum 9” (228.6 mm) air space between the outer wall ofthe chimney length and wall combustibles. Use sheet metalsupports fastened securely to wall surfaces on all sides, tomaintain the 9” (228.6 mm) air space. When fasteningsupports to chimney length, do not penetrate the chimneyliner (the inside wall of the Solid-Pak chimney). The innerend of the Solid-Pak chimney section shall be flush withthe inside of the masonry chimney flue, and sealed with aMethod C. 6” (152.4 mm) Clearance to Combustible WallMember: Starting with a minimum 24 gage (.024” [.61 mm])6” (152.4 mm) metal chimney connector, and a minimum 24gage ventilated wall thimble which has two air channels of1” (25.4 mm) each, construct a wall pass-through. Thereshall be a minimum 6” (152.4) mm separation areacontaining fiberglass insulation, from the outer surface ofthe wall thimble to wall combustibles. Support the wallthimble, and cover its opening with a 24-gage minimumsheet metal support. Maintain the 6” (152.4 mm) space.There should also be a support sized to fit and hold themetal chimney connector. See that the supports arefastened securely to wall surfaces on all sides. Make surefasteners used to secure the metal chimney connector donot penetrate chimney flue liner.© <strong>Forno</strong> <strong>Bravo</strong>, LLC 2010. All Rights Served. Ver. 1.3 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!