11.07.2015 Views

Giardino Series Installation.pdf - Forno Bravo

Giardino Series Installation.pdf - Forno Bravo

Giardino Series Installation.pdf - Forno Bravo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Giardino</strong> <strong>Installation</strong> and Operating Manual5. Build a grid of 1/2" rebar slightly shorter than theexternal dimension of the wood forms, on 12" centers,starting 6" in from the edges of the form, set half-way upthe 3 1/2” concrete layer (about 1 3/4”).3.7. FB Board set in place.3.4 Rebar set in center of the concrete pad.6. Pour 3 1/2” of standard concrete and allow for it to startcuring before adding the FB Board. Yo do not want toinstall FB Board on wet concrete, as it will wick up water3.6. Structural layer waiting on insulating layer.7. Cut and place the FB Board insulation, making sure theinsulation and the <strong>Giardino</strong> oven face straight forward andthat the front of the oven is exactly where you want it.© <strong>Forno</strong> <strong>Bravo</strong>, LLC 2010. All Rights Served. Ver. 1.3 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!