Chibro Petition - UJVN Limited Dehradun...
Chibro Petition - UJVN Limited Dehradun...
Chibro Petition - UJVN Limited Dehradun...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
True-up of FY09, FY10, FY11 & MYT <strong>Petition</strong> for FY14, FY15, FY16Table 23: Proposed Depreciation (Rs. Cr.) for FY 2013-14 to FY 2015-162.3.3 It is respectfully prayed that the depreciation proposed in accordance withabove paragraphs Rs. 0.543 Cr., Rs. 0.503 Cr. and Rs. 0.447 Cr. for the FY 2013-14, FY 2014-15 and FY 2015-16 respectively, may kindly be considered andallowed by the Hon’ble Commission.2.4 Interest on Loan Capital2.4.1 It is submitted that in terms of the directives of the Hon’ble Commission,interest on normative debt has been considered on the value equivalent to70% of additional capitalisation only.2.4.2 Rate of Interest is assumed to be same as calculated for FY 2011-12 which isweighted average rate of interest on actual loan for MB-II hydro powerproject.2.4.3 Accordingly, the interest on normative debt has been calculated as under:-:<strong>Chibro</strong> HEP November 2012 Page 22