11.07.2015 Views

Chibro Petition - UJVN Limited Dehradun...

Chibro Petition - UJVN Limited Dehradun...

Chibro Petition - UJVN Limited Dehradun...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

True-up of FY09, FY10, FY11 & MYT <strong>Petition</strong> for FY14, FY15, FY161.10.2 It is respectfully submitted that Annual Fixed Charges Rs. 25.83 Cr., Rs. 32.60Cr. and Rs. 36.00 Cr. for FY 2008-09, FY 2009-10 and FY 2010-11 respectively,may kindly be approved and allowed for energy sales to UPCL.1.11 Normative Capacity Index1.11.1 Based on the norms for storage hydro stations and run of the river stationswith pondage, the normative capacity index for the station is 85%. The samehas been adopted by the petitioner. Hence, no deviation is sought on thisaccount from the norms as determined by the Hon’ble Commission.1.12 Design Energy1.12.1 It is respectfully submitted that in the previous Tariff Orders, Commission haddetermined the Design Energy 671.29 MU for the project, excluding theauxiliary consumption and transformation losses, based on the averagegeneration of 15 years. Commission, in the said Tariff Orders has alsoemphasised to reassess the design energy. Now, <strong>Petition</strong>er has reassessed thedesign energy and details of methodology adopted along with calculationformats are provided in the Business Plan which is being submitted to Hon’bleCommission separately. In accordance with the said business plan, the designenergy and net primary energy is reproduced as under:Table 16: Design Energy and Net Primary Energy1.12.2 In accordance with above table the net primary energy 620.6 MU is proposedto be considered for the purpose of True Up, subject to the consideration ofthe same in the detailed business plan by the Hon’ble Commission.<strong>Chibro</strong> HEP November 2012 Page 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!