11.07.2015 Views

2011 - Town of Warner

2011 - Town of Warner

2011 - Town of Warner

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bookkeeper’s Detailed Expenditures (cont,)Project ExpensesNorth Village Road and Culvert ReplacementEngineering Expense $9,474.48Construction/Paving Expense $224,682.79Materials Expense $98,745.28Gravel (10,080 c.y. town supply) $30,240.00Traffic Control $5,506.31Total $368,648.86The <strong>2011</strong> road construction project took place on North Village Road.Weaver Brothers excavated, rebuilt and removed 2,100 feet on NorthVillage Road and 250 feet <strong>of</strong> intersecting Waldron Hill Road. MitchieCorporation built and replaced Silver Brook’s “red” listed steel multiplateculvert with a rigid frame bridge. The Highway Department hauledaway the 8” water pipe and sold it as #1 cast steel; the amount receivedwas $9,434.96 which was deposited into the general fund.52

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!