Construction and Performance of Curtain Wall Systems for Super ...
Construction and Performance of Curtain Wall Systems for Super ... Construction and Performance of Curtain Wall Systems for Super ...
Curtain wall installationfor the typical floors
Close up of the rebate on the sides of the building exterior
- Page 1 and 2: Construction and Performance ofCurt
- Page 3 and 4: Development of Curtain Wall Systems
- Page 5 and 6: Development of Curtain Wall Systems
- Page 7 and 8: The city profile of Hong Kong as vi
- Page 9 and 10: Close up seeing the buildingfaçade
- Page 11 and 12: Merits of using curtain wall in bui
- Page 13 and 14: Stick SystemCurtain wall in stick s
- Page 15: Unit SystemUnit systems are compose
- Page 18 and 19: Unit and mullion systemThis is a co
- Page 20 and 21: Column-cover-and-spandrel systemCol
- Page 22 and 23: pGlass wall and skylight for the Fe
- Page 24 and 25: pGlass wall used for theHong Kong C
- Page 26 and 27: The glass wall for theInternational
- Page 28 and 29: Glass Wall andSkylight used in theI
- Page 30 and 31: Functions and performance requireme
- Page 32 and 33: Testing of curtain wall1) air infil
- Page 34 and 35: Handling of thewindow units
- Page 36 and 37: Detail of fixing (basicallyfixed on
- Page 38 and 39: Setting up of a mock-up wall sectio
- Page 40 and 41: Shun Hing Plaza- 68-storey officebu
- Page 42 and 43: Close up of the mullion frame at th
- Page 44 and 45: Wall to cover thebracing membersloc
- Page 46 and 47: Detail of the fixing bracket
- Page 48 and 49: Manulife Tower(Lee Garden HotelRede
- Page 52 and 53: Close up seeing the wallingarrangem
- Page 54 and 55: Transporting the wall unitsinto the
- Page 56 and 57: Close up of the standard units
- Page 58 and 59: The configuration of the building f
- Page 60 and 61: Gondola set up to facilitate theins
- Page 62 and 63: Pyramid feature atthe building corn
- Page 64 and 65: Detail of the backing frame before
- Page 66 and 67: Seeing the window fromthe pyramid
- Page 68 and 69: Rail track for the hanging-typeslid
- Page 70 and 71: Close up detail of theautomatic cle
- Page 72: Cheung KongCenter at night
- Page 75 and 76: Belt truss atbuilding topCurtain wa
- Page 77 and 78: Backing frame for the louveredpanel
- Page 79 and 80: Fixing detail of the panels
- Page 81 and 82: Detail of the louvered panels
- Page 83 and 84: Exterior detail ofthe standard pane
- Page 85 and 86: Enlarged detail of a typical panel
- Page 87 and 88: Close up of standard panels seeing
- Page 89 and 90: ResidentialDevelopment atStubbs Roa
- Page 91 and 92: Detail of the built-in anchorchanne
- Page 93 and 94: Detail of the fixing atthe rebate w
- Page 95: Langham Place -Commercial Complex w
Close up <strong>of</strong> the rebate on the sides <strong>of</strong> the building exterior