- Page 1 and 2:
Construction and Performance ofCurt
- Page 3 and 4:
Development of Curtain Wall Systems
- Page 5 and 6:
Development of Curtain Wall Systems
- Page 7 and 8:
The city profile of Hong Kong as vi
- Page 9 and 10:
Close up seeing the buildingfaçade
- Page 11 and 12:
Merits of using curtain wall in bui
- Page 13 and 14:
Stick SystemCurtain wall in stick s
- Page 15:
Unit SystemUnit systems are compose
- Page 18 and 19:
Unit and mullion systemThis is a co
- Page 20 and 21:
Column-cover-and-spandrel systemCol
- Page 22 and 23:
pGlass wall and skylight for the Fe
- Page 24 and 25:
pGlass wall used for theHong Kong C
- Page 26 and 27:
The glass wall for theInternational
- Page 28 and 29:
Glass Wall andSkylight used in theI
- Page 30 and 31:
Functions and performance requireme
- Page 32 and 33:
Testing of curtain wall1) air infil
- Page 34 and 35:
Handling of thewindow units
- Page 36 and 37:
Detail of fixing (basicallyfixed on
- Page 38 and 39:
Setting up of a mock-up wall sectio
- Page 40 and 41:
Shun Hing Plaza- 68-storey officebu
- Page 42 and 43:
Close up of the mullion frame at th
- Page 44 and 45:
Wall to cover thebracing membersloc
- Page 46 and 47:
Detail of the fixing bracket
- Page 48 and 49:
Manulife Tower(Lee Garden HotelRede
- Page 50 and 51:
Curtain wall installationfor the ty
- Page 52 and 53: Close up seeing the wallingarrangem
- Page 54 and 55: Transporting the wall unitsinto the
- Page 56 and 57: Close up of the standard units
- Page 58 and 59: The configuration of the building f
- Page 60 and 61: Gondola set up to facilitate theins
- Page 62 and 63: Pyramid feature atthe building corn
- Page 64 and 65: Detail of the backing frame before
- Page 66 and 67: Seeing the window fromthe pyramid
- Page 68 and 69: Rail track for the hanging-typeslid
- Page 70 and 71: Close up detail of theautomatic cle
- Page 72: Cheung KongCenter at night
- Page 75 and 76: Belt truss atbuilding topCurtain wa
- Page 77 and 78: Backing frame for the louveredpanel
- Page 79 and 80: Fixing detail of the panels
- Page 81 and 82: Detail of the louvered panels
- Page 83 and 84: Exterior detail ofthe standard pane
- Page 85 and 86: Enlarged detail of a typical panel
- Page 87 and 88: Close up of standard panels seeing
- Page 89 and 90: ResidentialDevelopment atStubbs Roa
- Page 91 and 92: Detail of the built-in anchorchanne
- Page 93 and 94: Detail of the fixing atthe rebate w
- Page 95: Langham Place -Commercial Complex w
- Page 101: Maintenance Considerationcommon pro