Professional Application Guide - Alexseal
Professional Application Guide - Alexseal
Professional Application Guide - Alexseal
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Technical Data SheetsTechnical Data Sheet: 153-14P3002Technical Data SheetsTechnical Data Sheet: 153-14P3002Super Build 302 (continued)Apply 2 to 3 coats to a wet film thickness (WFT) of 6 - 12 mils (150 - 300 microns) percoat. This will achieve a dry film thickness (DFT) of 6 - 12 mils (150 - 300 microns) fora 2 coat application, and 9 - 15 mils (225 - 450 microns) for a 3 coat application, using25 % reduction. Minimum recommended film thickness before sanding is 6 mils (150microns) DFT. Maximum recommended film thickness during a spray application is 3coats totaling 36 mils (960 microns) WFT, or 20 mils (500 microns) DFT.AcceleratorA4030 ALEXSEAL ® Accelerator for Super Build 302 is used to reduce the drying time ofALEXSEAL ® Super Build 302. At the same time, use of A4030 ALEXSEAL ® Acceleratorfor Super Build 302 reduces the pot life.10. PackagingP3002 ALEXSEAL ® Super Build 302 1 GalC3052 ALEXSEAL ® Super Build 302 Converter 1 GalR3040 ALEXSEAL ® High Build Epoxy Reducer 1 QT & 1 GalA4030 ALEXSEAL ® Accelerator Super Build 302 1 PTAdditional NotesPer each 1 gallon of P3002 ALEXSEAL ® Super Build 302 base, a maximum of 1 pint(16 oz) of A4030 ALEXSEAL ® Epoxy Primer Accelerator may be added. Additionalquantities of accelerator reduce pot life, and are not recommended. Mix ratio quantityfor A4030 is for base quantity used in mixture. Example 1 P3002:1 C3052:1/4R3040:1/4 A4030.9. Pot Life and DryingTemperature for minimum time 15°C(60°F)20°C(68°F)25°C(77°F)30°C(85°F)Max DryTimePot Life - approx. 12 hrs 12 hrs 12 hrs 12 hrs 12 hrsPot Life - with A4030 ALEXSEAL ®Accelerator for Super Build 3026 hrs 6 hrs 6 hrs 6 hrs N/AFully Cured 21 days 18 days 14 days 10 days N/ATape Dry - without accelerator 30 hrs 24 hrs 18 hrs 12 hrs N/ATape Dry - with A4030ALEXSEAL ® Accelerator SuperBuild 302Recoat with another coat ofALEXSEAL ® Super Build 302Overcoat with another productincluding 202, 303, 328,357, 442 or 501. Preparationincluding sanding is requiredafter max time.24 hrs 18 hrs 12 hrs 10 hrs N/A4 hrsminimum12 hrsminimum2 hrsminimum12 hrsminimum1 hrsminimum12 hrsminimum1 hrsminimum12 hrsminimum24 hrsmaximum24 hrsmaximumNote:The above chart reflects approximate minimum and maximum time. Surfacetemperature, air flow, direct or non-direct sunlight, quantity and or choice of reducer,and film thickness will effect actual tack up, recoat, overcoat, and drying times during application.During the drying phase the minimum temperature is 15°C (60°F). Ideal temperature: 25°C (77°F).The minimum application condition should be 3°C (5.4°F) above dew point.90ALEXSEAL ® <strong>Professional</strong> <strong>Application</strong> <strong>Guide</strong> version 0.4.3ALEXSEAL.COM > Europe: +49 0 40 75 10 30 > North America: +1 843 654 775591