11.07.2015 Views

Book - School of Science and Technology

Book - School of Science and Technology

Book - School of Science and Technology

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

62 The building in winterfollowing extensive examination <strong>of</strong> a number <strong>of</strong> buildings <strong>of</strong> various types. Figure 2.15provides a summary which illustrates the order <strong>of</strong> saving in fuel consumption which maybe achieved as a result <strong>of</strong> intermittent operation.Preheat capacityWhen a heating system is operated intermittently, the temperature within the building willfall during the period <strong>of</strong> system shut-down <strong>and</strong>, in order to restore this to the proper levelby the time the occupants arrive, a preheating period is necessary. Since the outsidetemperature varies during the winter nights, so will the time required for preheat increaseor decrease <strong>and</strong> control equipment which provides means for dealing with this variation isdescribed in Chapter 22 (p. 639).OccupancyInternal temperature °C6800 4 8 12 16 20 24Time hBoostperiodOccupancyHeat input percent load100Boostlevel00 4 8 12 16 20 24Time hFigure 2.16 Pr<strong>of</strong>iles <strong>of</strong> temperature <strong>and</strong> load for intermittent heating

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!