11.07.2015 Views

Book - School of Science and Technology

Book - School of Science and Technology

Book - School of Science and Technology

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

System arrangements 617It is the use <strong>of</strong> a series <strong>of</strong> such empirical assumptions, in parallel with more reasonedconsideration <strong>of</strong> diversity <strong>of</strong> use, that has led to the reappraisal, previously mentioned, <strong>of</strong>the roles <strong>of</strong> the traditional `flows <strong>and</strong> returns'.Air venting <strong>of</strong> high level storesIt is essential that each vessel be provided with a separate open vent pipe taken up to asuitable height <strong>and</strong> it should be noted that an automatic air release valve is not anacceptable substitute. This provision is necessary to provide against collapse (implosion)<strong>of</strong> the vessel when water is drawn from it.Tall buildingsBearing in mind the comments made earlier regarding problems <strong>of</strong> excess pressure atdraw-<strong>of</strong>f points, the case <strong>of</strong> very tall buildings is worth consideration. The preferredCisternCirculationCold feedHead tankHead tankR191817161514131211Calorifier 10H.W. PointsCalorifierPumpP987654321GPumpPrimariesBFigure 21.11 Intermediate plant rooms in tall buildings

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!