11.07.2015 Views

Book - School of Science and Technology

Book - School of Science and Technology

Book - School of Science and Technology

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Boiler houses ± size <strong>and</strong> location 267Room sealed casingProducts <strong>of</strong>combustion1m MinimumConnectorboxCap to flueAir inlet toannulusFlashingRo<strong>of</strong>CombustionairS EDuctFlueRoomsealedcasingBoilerAir duct(a)(b)Figure 10.5 Balanced flues for boilers: (a) horizontal; (b) verticalwords, when selecting the boiler power for such a combined system, it may not benecessary to add the whole or even a part <strong>of</strong> the heat exchanger rating to that <strong>of</strong> theheating system. This approach is not valid, <strong>of</strong> course, where a very large hot water loadoccurs in a building having a small heating load, e.g. for a large kitchen or laundry.(although the converse might possibly apply in these circumstances!)In summer, when the heating plant is not in use, service to the heat exchanger might stillbe dealt with in the case <strong>of</strong> a single boiler if this were not disproportionately large.Similarly, where a multi-boiler plant is envisaged, it could be that the selection overallwould <strong>of</strong>fer the opportunity to include one boiler which was small enough to be kept inuse during the summer.Boiler houses ± size <strong>and</strong> locationVarious attempts have been made to provide guidance for provision, in a new building, <strong>of</strong>boiler <strong>and</strong> other plant rooms <strong>of</strong> adequate size <strong>and</strong> suitable location. In general terms, it iseasier to suggest that the site should be at the thermal centre <strong>of</strong> the load than to define thesize in either area or length width.SizeIt is <strong>of</strong>ten the case that information in this respect is requested long before adequatedetails <strong>of</strong> the building structure are available with the result that the required boilercapacity cannot be determined to greater accuracy than plus or minus 25% or more.Furthermore, there are so many types <strong>of</strong> boiler <strong>and</strong> kinds <strong>of</strong> arrangement that advice atthis stage <strong>of</strong> building development cannot be more than in very general terms. Someboilers are long <strong>and</strong> narrow; some are short <strong>and</strong> tall; some are sectional whereas othersare factory packaged with the result that, in that instance, availability <strong>of</strong> access fordelivery may be a critical factor.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!