11.07.2015 Views

1 Minutes of the 36th Meeting of the Expert Appraisal Committee ...

1 Minutes of the 36th Meeting of the Expert Appraisal Committee ...

1 Minutes of the 36th Meeting of the Expert Appraisal Committee ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ix.Regular monitoring <strong>of</strong> influent and effluent surface, sub-surface and ground water should beensured and treated wastewater should meet <strong>the</strong> norms prescribed by <strong>the</strong> State Pollution ControlBoard or described under <strong>the</strong> E(P) Act whichever are more stringent. Leachate study for <strong>the</strong>effluent generated and analysis should also be regularly carried out and report submitted to <strong>the</strong>Ministry’s Regional Office at Lucknow, SPCB and CPCB.x. All <strong>the</strong> bag filter dust, raw mill dust, coal dust, clinker dust and cement dust from pollution controldevices should be recycled and reused in <strong>the</strong> process and used for cement manufacturing. Spentoil and batteries shall be sold to authorized recyclers / reprocessors only.xi. All <strong>the</strong> fly ash shall be utilized as per Fly ash Notification, 1999 subsequently amended in 2003.Efforts should be made to use fly ash maximum in making Pozollona Portland Cement (PPC).xii.xiii.xiv.xv.xvi.xvii.Efforts shall be made to use low-grade lime, more fly ash and solid waste in <strong>the</strong> cementmanufacturing.An effort shall be made to use <strong>of</strong> high calorific hazardous waste in <strong>the</strong> cement kiln and necessaryprovision should be made accordingly.As proposed, green belt shall be developed in at least 33 % area in and around <strong>the</strong> cement plantas per <strong>the</strong> CPCB guidelines to mitigate <strong>the</strong> effects <strong>of</strong> air emissions in consultation with localDFO.All <strong>the</strong> recommendations made in <strong>the</strong> Charter on Corporate Responsibility for EnvironmentProtection (CREP) for <strong>the</strong> Cement plants should be implemented.All <strong>the</strong> commitments made to <strong>the</strong> public during <strong>the</strong> Public Hearing / Public Consultation meetingheld on 27 th June, 2011 shall be satisfactorily implemented and a separate budget forimplementing <strong>the</strong> same shall be allocated and information submitted to <strong>the</strong> Ministry’s RegionalOffice at Lucknow.At least 5 % <strong>of</strong> <strong>the</strong> total cost <strong>of</strong> <strong>the</strong> project shall be earmarked towards <strong>the</strong> Enterprise SocialCommitment based on Public Hearing Issues and item-wise details along with time bound actionplan shall be prepared and submitted to <strong>the</strong> Ministry’s Regional Office at Lucknow.Implementation <strong>of</strong> such program shall be ensured accordingly in a time bound manner.Proposals for TORs36.3.9 Proposed 5.0 MTPA Integrated Cement Clinkerization Plant, 8.0 MTPA Cement Grinding Unit,100 MW captive Power Plant and 7.0 MTPA Captive Lime stone with mining lease area <strong>of</strong>997.08 ha at Village Gollapalli, Mandal Mylavaram, District Kaddapa (Y.S.R.) in AndhraPradesh by M/s ACC Limited - regarding TORsThe proponent informed that <strong>the</strong>y will not be able to attend <strong>the</strong> meeting. The <strong>Committee</strong> decidedto consider <strong>the</strong> project as and when requested by <strong>the</strong> proponent.36.3.10 Proposed Low and Medium Carbon Ferro Manganese (6,000 TPA) Plant at Plot No. B-23,Village Butibori, Tehsil Hingna, District Nagpur in Maharashtra by M/s Vulcan Alloys -regarding TORsThe project authorities gave a presentation on <strong>the</strong> salient features <strong>of</strong> <strong>the</strong> project and proposedenvironmental protection measures to be undertaken along with <strong>the</strong> draft TORs for preparation <strong>of</strong>EIA/EMP report. All <strong>the</strong> ferro alloy plants are listed at S.No. 3(a) in primary metallurgical industry underCategory-A <strong>of</strong> <strong>the</strong> Schedule <strong>of</strong> EIA Notification, 2006 and appraised by <strong>the</strong> <strong>Expert</strong> <strong>Appraisal</strong> <strong>Committee</strong>(Industry-1) in <strong>the</strong> MoEF.57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!