11.07.2015 Views

1 Minutes of the 36th Meeting of the Expert Appraisal Committee ...

1 Minutes of the 36th Meeting of the Expert Appraisal Committee ...

1 Minutes of the 36th Meeting of the Expert Appraisal Committee ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ix.The water consumption shall not exceed as per <strong>the</strong> standard prescribed for <strong>the</strong> steel plants.x. All <strong>the</strong> coal fines, char from DRI plant shall be utilized in AFBC boiler <strong>of</strong> power plant and no charshall be used for briquette making or disposed <strong>of</strong>f anywhere else. AFBC boiler shall be installedsimultaneously along with <strong>the</strong> DRI plant to ensure full utilization <strong>of</strong> char from <strong>the</strong> beginning. Scrapshall be used in steel melting shop (SMS) and SMS slag and kiln accretions shall be properlyutilized. All <strong>the</strong> o<strong>the</strong>r solid waste including broken refractory mass shall be properly disposed <strong>of</strong>f inenvironment-friendly manner.xi.xii.xiii.xiv.xv.xvi.xvii.xviii.xix.xx.Proper utilization <strong>of</strong> fly ash shall be ensured as per Fly Ash Notification, 1999 and subsequentamendment in 2003.Vehicular pollution due to transportation <strong>of</strong> raw material and finished products shall becontrolled. Proper arrangements shall also be made to control dust emissions during loading andunloading <strong>of</strong> <strong>the</strong> raw material and finished product.All internal roads shall be black topped. The roads shall be regularly cleaned with mechanicalsweepers. A 3-tier avenue plantation using native species shall be developed along <strong>the</strong> roads.Facilities for parking <strong>of</strong> trucks carrying raw coal from <strong>the</strong> linked coalmines shall be created within <strong>the</strong>Unit.Proper handling, storage, utilization and disposal <strong>of</strong> all <strong>the</strong> solid waste shall be ensured and regularreport regarding toxic metal content in <strong>the</strong> waste material and its composition, end use <strong>of</strong>solid/hazardous waste should be submitted to <strong>the</strong> Ministry’s Regional Office at Bhopal, SPCB andCPCB.A time bound action plan shall be submitted to reduce solid waste, its proper utilization and disposal.Risk and Disaster Management Plan along with <strong>the</strong> mitigation measures shall be prepared and acopy submitted to <strong>the</strong> Ministry’s Regional Office at Bhopal, SPCB and CPCB within 3 months <strong>of</strong>issue <strong>of</strong> environment clearance letter.As proposed, green belt shall be developed in 33 % <strong>of</strong> plant area as per <strong>the</strong> CPCB guidelines inconsultation with <strong>the</strong> DFO.All <strong>the</strong> recommendations made in <strong>the</strong> Charter on Corporate Responsibility for EnvironmentProtection (CREP) for <strong>the</strong> Steel Plants should be implemented.At least 5 % <strong>of</strong> <strong>the</strong> total cost <strong>of</strong> <strong>the</strong> project should be earmarked towards <strong>the</strong> corporate socialresponsibility and item-wise details along with time bound action plan should be prepared andsubmitted to <strong>the</strong> Ministry’s Regional Office at Bhopal. Implementation <strong>of</strong> such program should beensured accordingly in a time bound manner.The company shall provide housing for construction labour within <strong>the</strong> site with all necessaryinfrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP, safe drinking water,medical health care, crèche etc. The housing may be in <strong>the</strong> form <strong>of</strong> temporary structures to beremoved after <strong>the</strong> completion <strong>of</strong> <strong>the</strong> project.36.2.2 Expansion <strong>of</strong> Ferro Alloys manufacturing facility at Plot No. 368, Growth Centre, APIIC- Bobbili(Village & Mandal), Vizianagaram Dist. Andhra Pradesh by M/s. Berry Alloys Limited (BAL) -regarding Environmental ClearanceThe project authorities and <strong>the</strong>ir consultant, M/s Sri Sai Manasa Nature Tech Pvt. Ltd.,Hyderabad gave a detailed presentation on <strong>the</strong> salient features <strong>of</strong> <strong>the</strong> project and proposedenvironmental protection measures to be undertaken as per Terms <strong>of</strong> Reference (ToRs) awardedduring <strong>the</strong> 18 th <strong>Meeting</strong> <strong>of</strong> <strong>the</strong> <strong>Expert</strong> <strong>Appraisal</strong> <strong>Committee</strong> (Industry-1) held on 24 th - 25 th January,2011, for preparation <strong>of</strong> EIA/EMP. All <strong>the</strong> Ferro alloy plants are listed at S.No. 3(a) in Primary Metallurgy4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!