11.07.2015 Views

Local Legislators' Toolkit - The Sangguniang Panlalawigan ng ...

Local Legislators' Toolkit - The Sangguniang Panlalawigan ng ...

Local Legislators' Toolkit - The Sangguniang Panlalawigan ng ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5. Cover – two (2) forms of cover consisti<strong>ng</strong> of soil and geosynthetic materials toprotect the waste from lo<strong>ng</strong>-term contact with the environment:a. A daily cover placed over the waste at the close of the day’s operations, andb. A final cover, or cap, which is the material placed over the completed landfillto control infiltration of water, gas emission to the atmosphere, and erosion.6. Closure Procedure – with the objectives of establishi<strong>ng</strong> low maintenance coversystems and final cover that minimizes the infiltration of precipitation into the waste.Installation of the final cover must be completed within six (6) months of the lastreceipt of wastes; and7. Post-closure procedure – Duri<strong>ng</strong> this period, the landfill owner shall be responsiblefor providi<strong>ng</strong> for the general upkeep of the landfill, maintaini<strong>ng</strong> all of the landfill’senvironmental protection features, operati<strong>ng</strong> monitori<strong>ng</strong> equipment, remediati<strong>ng</strong>groundwater should it become contaminated and controlli<strong>ng</strong> landfill gas migration oremission.SECTION 60. Operati<strong>ng</strong> Criteria for Sanitary Landfills. <stro<strong>ng</strong>>The</stro<strong>ng</strong>> followi<strong>ng</strong> are theminimum operati<strong>ng</strong> requirements for landfill site operators:a. Disposal site records of, but not limited to:1. Records accurate to within ten percent (10%) of weights or volumes andadequate for overall planni<strong>ng</strong> purposes and forecasti<strong>ng</strong> the rate of site filli<strong>ng</strong>.Such records shall be submitted to the DENR upon request.2. Records of excavations which may affect the safe and proper operation of thesite or cause damage to adjoini<strong>ng</strong> properties;3. Daily logbook or file of the followi<strong>ng</strong> information: fires, landslides, earthquakedamage, unusual and sudden settlement, injury and property damage, accidents,explosions, receipt or rejection of unpermitted wastes, floodi<strong>ng</strong>, and otherunusual occurrences;4. Record of personnel traini<strong>ng</strong>; and5. Copy of written notification to the DENR, local health agency, and fire authority ofnames, addresses and telephone numbers of site operators;b. Water quality monitori<strong>ng</strong> of surface and ground waters and effluent, and gasemissions;c. Documentation of approvals, determinations and other requirements by the DENR;d. Signs1. Each point of access from a public road shall be posted with an easily visiblesign indicati<strong>ng</strong> the facility name and other pertinent information;2. If the site is open to the public, there shall be an easily visible road sign whichdirect traffic to the proper area where wastes will be deposited and the scheduleof charges.3. Signs to protect personnel and public health should be posted.e. Monitori<strong>ng</strong> of quality of surface, ground and effluent waters, and gas emissions;f. <stro<strong>ng</strong>>The</stro<strong>ng</strong>> site shall be designed to discourage unauthorized access by persons andvehicles by usi<strong>ng</strong> perimeter barriers. Areas within the site where open storage orpoundi<strong>ng</strong> of hazardous materials shall be separately fenced.g. Roads within the permitted facility boundary shall be designed to minimize thegeneration of dust and trucki<strong>ng</strong> of materials onto adjacent roads. Such roads shall bewell maintained that vehicle access and unloadi<strong>ng</strong> can be conducted duri<strong>ng</strong>inclement weather;h. Sanitary facilities such as toilet and hand washi<strong>ng</strong> facilities shall be available topersonnel at or in the immediate vicinity of the site;i. Safe and adequate drinki<strong>ng</strong> water supply for site personnel shall be available;256

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!