11.07.2015 Views

Local Legislators' Toolkit - The Sangguniang Panlalawigan ng ...

Local Legislators' Toolkit - The Sangguniang Panlalawigan ng ...

Local Legislators' Toolkit - The Sangguniang Panlalawigan ng ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

landfills and other solid waste facilities. <stro<strong>ng</strong>>The</stro<strong>ng</strong>> illustration shall indicate as well theproposed sites for disposal and other solid waste facilities;d. Estimated solid waste generation and projection by source such as residential,market, commercial, industrial, construction or demolition, street waste,agricultural, agro-industrial, other wastes; ande. Inventory of existi<strong>ng</strong> waste disposal and other solid waste facilities andcapacities.f. Waste Characterization- For the initial source reduction and recycli<strong>ng</strong> element ofa local waste management plan, the LGU waste characterization componentshall identify the constituent materials which comprise the solid waste generatedwithin the jurisdiction of Sebaste. <stro<strong>ng</strong>>The</stro<strong>ng</strong>> information shall be representative of thesolid waste generated and disposed of within that area. <stro<strong>ng</strong>>The</stro<strong>ng</strong>> constituent materialsshall be identified by volume, percentage in weight or its volumetric equivalent,material type, and source of generation which includes residential, commercial,industrial, governmental, or other sources.g. Collection and Transfer- <stro<strong>ng</strong>>The</stro<strong>ng</strong>> plan shall take into account the geographicsubdivisions to define the coverage of the solid waste collection area in everybara<strong>ng</strong>ay as well as the strategies and activities to be undertaken by itscomponent bara<strong>ng</strong>ays in collecti<strong>ng</strong> and transferri<strong>ng</strong> of wastes.h. Processi<strong>ng</strong> – <stro<strong>ng</strong>>The</stro<strong>ng</strong>> plan shall define the methods and the facilities required toprocess the solid waste, includi<strong>ng</strong> the use of intermediate treatment facilities forcomposti<strong>ng</strong>, recycli<strong>ng</strong>, conversion and other waste processi<strong>ng</strong> systems. Otherappropriate waste processi<strong>ng</strong> technologies may also be considered provided thatsuch technologies conform with internationally-acceptable and other standardsset in other laws and regulations.i. Source Reduction- <stro<strong>ng</strong>>The</stro<strong>ng</strong>> source reduction component shall include program andimplementation schedule which shows the methods by which the LGU will, incombination with the recycli<strong>ng</strong> and composti<strong>ng</strong> components, reduce sufficientamount of solid waste disposed.j. Recycli<strong>ng</strong>- This component shall include a program and implementation schedulewhich shows the methods by which the LGU shall, in combination with the sourcereduction and composti<strong>ng</strong> components, reduce a sufficient amount of solid wastedisposed.k. Composti<strong>ng</strong>- This component shall include a program and implementationschedule which shows the methods to be undertaken in combination with thesource reduction and recycli<strong>ng</strong> components, reduce a sufficient amount of solidwaste disposed of within Sebaste.l. Solid Waste Facility Capacity and Final Disposal- This component shall includebut not limited to a projection of the amount of disposal capacity needed toaccommodate the solid waste generated, reduced by the followi<strong>ng</strong>:1. Implementation of source reduction, recycli<strong>ng</strong>, and composti<strong>ng</strong>;2. Any permitted disposal facility which shall be available duri<strong>ng</strong> the10-year planni<strong>ng</strong> period; and3. Disposal capacity which has been secured through an agreementwith another LGU or with solid waste enterprise.<stro<strong>ng</strong>>The</stro<strong>ng</strong>> plan shall make provisions for the closure or eventual phase out of anopen dumpsite within the period specified by Section 37 of R.A. 9003(Prohibition Against the use of Open Dumps). As a alternative, sanitarylandfill sites shall be designed and operated as a final disposal site for solidand eventually, residual wastes of the municipality. Sanitary landfills shall bedesigned and operated in accordance with R.A. 9003.252

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!