11.07.2015 Views

Avalanche User Guide - Wavelink

Avalanche User Guide - Wavelink

Avalanche User Guide - Wavelink

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 8: Managing a Mobile Device Server 74Event typeTimeConstraintsSelect a one-time event, a recurring event, or a post-synchronization event.A post-synchronization event will take place after each synchronizationbetween the Enterprise Server and the Mobile Device Server. This ensuresthat each time the Server is updated, the devices are as well.Set the start time and, if desired, the end time for the event.Allow themobile deviceuser to overridethe updateCreates a prompt when the update is scheduled to occur that allows themobile device user to override the update.Deleteorphanedpackagesduring theupdateCauses packages that have been orphaned to be removed from the device. Apackage is considered orphaned if it has been deleted from the <strong>Avalanche</strong>Console, if the software profile it belongs to has been disabled, or if thepackage has been disabled.Force packagesynchronizationduring theupdateCauses the Mobile Device Server to verify the existence and state of each fileof each package individually rather than consulting the meta-file whichwould normally provide information on those files.To schedule a profile-specific device update:1 From the Profiles tab, select the profile from the Profile List.2 Click Edit.3 From the Blackouts and Updates tab, click Add Event.The Add Scheduled Update dialog box appears.4 Select the event type. If you select Recurring Event, the Recurring Period lists becomeactive. The first list allows you to determine whether the update occurs on either a daily orweekly basis. If you select Weekly from this list, the second list becomes active, allowingyou to select the day on which the update occurs.5 Set the start time by clicking the calendar icon to open the Select a date and time dialog box.Choose the start time and click OK.NOTE: If you chose a post-synchronization event, the start and stop time options aredisabled.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!