- Page 1: Environmental Impacts ofMulti-Store
- Page 6 and 7: 4.3.5.5 Timber Building Finishes...
- Page 8 and 9: 9.5 Permanent Carbon Storage in Woo
- Page 10 and 11: - 10 -1 IntroductionThis report was
- Page 12 and 13: - 12 -2 Executive SummaryThe Resear
- Page 14 and 15: - 14 -3 Background3.1 Research goal
- Page 16 and 17: - 16 -recycling and use of demoliti
- Page 18 and 19: - 18 -3.4 Multi-Storey Timber Build
- Page 20 and 21: - 20 -The boards are usually about
- Page 22 and 23: - 22 -University of Sassari and the
- Page 24 and 25: - 24 -3.5.6 Market DriversThe marke
- Page 26 and 27: - 26 -School of Biological Sciences
- Page 28 and 29: - 28 -members, floors are timber /
- Page 30 and 31: - 30 -Calculations of the foundatio
- Page 32 and 33: - 32 -lightweight timber and steel
- Page 34 and 35: - 34 -The integrity of the steel bu
- Page 36 and 37: - 36 -In the TimberPlus building al
- Page 38 and 39: - 38 -residual/permanent deformatio
- Page 40 and 41: - 40 -A design feature of the Timbe
- Page 42 and 43: - 42 -comparison to the much larger
- Page 44 and 45: - 44 -5.2.3 Buildings’ Thermal En
- Page 46 and 47: - 46 -The HVAC system used in the s
- Page 48 and 49: - 48 -The total annual operational
- Page 50 and 51: - 50 -5.4 Masters ThesisThe Master
- Page 52 and 53:
- 52 -• evaluating the potential
- Page 54 and 55:
- 54 -6.3 Life Cycle Assessment of
- Page 56 and 57:
- 56 -The life cycle inventory data
- Page 58 and 59:
- 58 -250002000015000Energy (GJ)100
- Page 60 and 61:
- 60 -It was assumed that structura
- Page 62 and 63:
- 62 -In the steel recycling scenar
- Page 64 and 65:
- 64 -6.3.3.5 Operational EnergyTot
- Page 66 and 67:
- 66 -180000160000140000120000Energ
- Page 68 and 69:
- 68 -700060005000Energy (GJ)400030
- Page 70 and 71:
- 70 -100908070GWP (t CO2 equiv.)60
- Page 72 and 73:
- 72 -180,000160,000140,000120,000E
- Page 74 and 75:
- 74 -180,000160,000140,000120,000E
- Page 76 and 77:
- 76 -means that transport distance
- Page 78 and 79:
- 78 -The Green Star NZ office desi
- Page 80 and 81:
- 80 -Table 6.13: Overview of Green
- Page 82 and 83:
- 82 -6.4.4 ResultsThe number of po
- Page 84 and 85:
- 84 -6.5 Discussion and Conclusion
- Page 86 and 87:
- 86 -This shows that if a building
- Page 88 and 89:
- 88 -7 Building ConstructionThis c
- Page 90 and 91:
- 90 -• Wall and column to founda
- Page 92 and 93:
- 92 -Figure 7.4: Construction sche
- Page 94 and 95:
- 94 -8 A Review of the Timber Used
- Page 96 and 97:
- 96 -NZ has a limited supply of al
- Page 98 and 99:
- 98 -Note that whilst the utilisat
- Page 100 and 101:
- 100 -Gasification of waste wood i
- Page 102 and 103:
- 102 -Regional Council has put in
- Page 104 and 105:
- 104 -Landfilling would offer carb
- Page 106 and 107:
- 106 -9.2 Multi-Storey Timber Buil
- Page 108 and 109:
- 108 -Workshop Limited provided ex
- Page 110 and 111:
- 110 -This figure (0.377 Kg CO 2 e
- Page 112 and 113:
- 112 -Table 9.1 (middle column) sh
- Page 114 and 115:
- 114 -products. For example, in th
- Page 116 and 117:
- 116 -tonnes CO21,8001,6001,4001,2
- Page 118 and 119:
- 118 -800070006000tonnes CO2500040
- Page 120 and 121:
- 120 -Embodied energy.Embodied ene
- Page 122 and 123:
- 122 -environmental impacts and id
- Page 124 and 125:
- 124 -Table 10.1: Percentage of op
- Page 126 and 127:
- 126 -• How does the choice of f
- Page 128 and 129:
- 128 -For the TimberPlus building,
- Page 130 and 131:
- 130 -also Section 6.3.2.3.) This
- Page 132 and 133:
- 132 -ReferencesASHRAE American So
- Page 134 and 135:
- 134 -Nebel, B., Alcorn, A. and Wi
- Page 136 and 137:
- 136 -Appendix A: Material quantit
- Page 138 and 139:
- 138 -T Soffit Framing 3.8 87 330.
- Page 140 and 141:
- 140 -S/G Internal Wall Framing 3.
- Page 142 and 143:
- 142 -RoofS Wall Cladding Plantroo
- Page 144 and 145:
- 144 -T I M B E R P L U S B U I L
- Page 146 and 147:
- 146 -T I M B E R P L U S B U I L
- Page 148 and 149:
- 148 -Appendix C: Carbon release a
- Page 150:
- 150 -Appendix E: Letter from Holm
- Page 155 and 156:
Timber PlusA review of the timber u
- Page 157 and 158:
Timber Plus ProjectTimber Treatment
- Page 159 and 160:
Timber Plus ProjectRef. Title Aim o
- Page 161 and 162:
Timber Plus ProjectSustainable Timb
- Page 163 and 164:
Timber Plus ProjectTimber Utilised
- Page 165 and 166:
Timber Plus ProjectCOLUMNS, BEAMS,
- Page 167 and 168:
Timber Plus Project15 MDFMaterial:S
- Page 169 and 170:
Timber Plus ProjectROOF FRAMINGMate
- Page 171 and 172:
Timber Plus ProjectEXTERIOR WALL CL
- Page 173 and 174:
Timber Plus ProjectLOUVRESMaterial:
- Page 175 and 176:
Timber Plus ProjectReferences.1. NZ
- Page 177 and 178:
Resene expected paint system lifeTh
- Page 179 and 180:
New Zealand Forest ResearchInstitut
- Page 181 and 182:
New Zealand Forest Research Institu
- Page 183 and 184:
There were relatively small differe
- Page 185 and 186:
Timber plus buildingo The amount of
- Page 187 and 188:
The Green Star NZ building performa
- Page 189 and 190:
Introduction to Life Cycle Assessme
- Page 191 and 192:
Table 1-2-1: Green Star NZ Office D
- Page 193 and 194:
order of desirability of the less p
- Page 195 and 196:
the GreenStar assessment considerin
- Page 197:
1.5 ReferencesInternational standar