10.07.2015 Views

Recap 2009 - PURE AIR

Recap 2009 - PURE AIR

Recap 2009 - PURE AIR

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Lima Memorial HospitalThe Lima Memorial Hospital located in Lima, Ohio has installed Guardian Air units throughouttheir entire facility which covered the ICU, operating rooms, waiting rooms, and separatewings of the hospital. This is a three phase project, which is currently on itssecond stage. In the first phase they installed over 40 units to help combatsome odor problems, help prevent the spread of viruses and bacteria, and improvethe Indoor Air Quality as a whole in their main facility. The secondphase will cover some of the doctors’ offices and private sectors of thefacility. Just recently the facility manager from Lima had called to discussfuture possibilities in their sister hospital third phase. He expressedhow happy he and the Lima staff were at the results theGuardian Air and the PHI technology had provided them with their IAQissues. There are over 200 units being installed in all three phases,which should be completed sometime next year.Test Results:Disclaimer: RGF’s PHI products have not yet beenapproved, cleared or otherwise authorized by FDA and are not intendedto diagnose, mitigate, prevent, treat or cure the H1N1 FluVirus.MRSA 99% Staph 99% Listeria 99% E Coli 99% H1N1 99%The RGF Dream TeamChris and Mike have driven our Air units sales through theroof again bringing in another banner year!We’re Still Looking ForA Few Good PeopleChrisMikeWhat Recession?!• Regional HVAC PHI Managers• Commercial HVAC PHI/REMESystem Integrators• Web Site MarketingSend resumes to Louise MelilloGuardian Air Sales2006 2007 2008 <strong>2009</strong> 2010lmelillo@rgf.comRGF Products are Made In America

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!