10.07.2015 Views

gayatri projects limited - Edelweiss

gayatri projects limited - Edelweiss

gayatri projects limited - Edelweiss

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GAYATRI PROJECTS LIMITEDSr. Name of the Contract Location Contract Value Value of contractNo. (Rs. in lakhs) to be executed(Rs. in lakhs)2 Velugonda Project –Closing of Sunkesula Gap Kurnool, 25,450 22,450Excavation of Feeder Canal and Teegaleru Canal Andhra Pradeshincluding construction of CM & CD works DistributorySystem for 62,000 Acres (Package –2) on EPCTurn Key System.3 Flood Flow Canal – Earth work excavation, forming Jagitial, 18,700 10,000embankment and construction of CM & CD works Karimnagar,including investigation, designing and estimation of Andhra PradeshFlood Flow Main Cnal from KM 43.00 to KM 57.00(Package –2) in Karimnagar District on EPC Turn KeySystem4 Providing and laying double layer burnt clay tiles lining Surender Nagar, 2,473 100and constructing canal service road catch water drain Gujaratdowel and boundary gutter on S.B.C. Ch. 40.400to 50.00 km.5 Construction of Paver Lining work & Construction of Khandawa, 2,100 500WBM Road on Service Bank from R.D. 0" to 7 Km of Madhya PradeshI.S. Main CanalOther WorksSome of the other assignments which we are executing relate to expansion of red mud pond, ash pond and construction ofwagon tippler, road work, etc. The total contract value amounts to Rs. 9414 lakhs, out of which value of outstanding workamounts to Rs. 1200 lakhs.Some of the <strong>projects</strong> are as under:Sr. Name of the Contract Contract Value Value of contractNo. (Rs. in lakhs) to be executed(Rs. in lakhs)1 Expansion of Ash Pond at NALCO’s Alumina Refinery Damanjodi 3,290 5002 2 nd Phase Expansion of Red Mud Pond at Alumina Refinery, Damanjodi 2,768 1503 Area grading / filling & ealize of entire area of Power (2X250 MW)and construction of retaining wall in the premises of powerhouse at Korba East. 2,386 450Contracts we undertake may either be as a main contractor or subcontractor. Further we may outsource our work to oursubcontractor. This may be done in two ways. Either a part/portion of the work may be sub contracted or the entire contract,may be sub-contracted. When only part of the work is subcontracted it may broadly be in the nature of civil / technical works.When the main contractor sub contracts the entire work, sub contractor is fully responsible for execution of the project. Ourcompany normally sub-contracts works which are smaller in value. Our <strong>projects</strong> are concentrated in the Southern and WesternRegions.50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!