GAYATRI PROJECTS LIMITEDIn addition, top 5 <strong>projects</strong> completed for Dams and reservoir:Sr.No. Name of the Work Contract Value (Rs. in lakhs)1 Construction Kaniti Balancing Reservoir for VSP 2,795.002 Construction of Raw Water Pond for Jindal Vijayanagaram Steel Ltd 1,750.003 Construction & Raising of Ash Pond dykes to ancillary works for NALCO 926.004 Construction of Red Mud Pond and Ash Pond for NALCO 645.005 Construction of Dam 2&3-expansion project for NALCO at Damanjodi, 588.00Industrial ProjectsWe provide engineering construction services to various industrial <strong>projects</strong> for land preparation and grading, piling, constructionof internal roads, construction of buildings, fabrication of steel structures, etc., we have completed various industrial <strong>projects</strong>namely Area Grading and construction of roads and drains for Nagarjuna Fertilizer & Chemicals Limited Phase-II, Kakinada,Site grading and construction of roads drains and ponds at Reliance Petroleum Ltd. Jamnagar, Leveling and Grading workin Group-I for Simhadri Thermal Power Project, Development of Garment Complex at Thane, Land Develop. & Allied works,Civil Engineering Works, structural mills and balancing reservoir for Visakhapatnam Steel Plant, Construction of Red MudPond and Ash Pond works, Damanjodi, Construction of Railways line in 3 sections i.e. KR-51, KR-55 & KR-57 for Koraput-Rayagada Lane for Indian Railways, Construction of approach Berths and Back-up area at Kakinada Port, Kakinada SeaPorts Ltd., Extension and strengthening of Runway at 28th end of Calicut Airport, Calicut.Projects completed by us for industrial, railways and ports are as under:Industrial Projects:Sr.No. Name of the Work Contract Value (Rs. In lakhs)1 Civil Engineering works in Medium Merchant and Structural Mills ofVisakhapatnam Steel Plant 1,489.002 Civil, Structural and Architectural work at HPCL terminal, Vijayawada 1,380.003 Civil Engineering Works in Auxiliary Shops Zone-M of VisakhapatnamSteel Plant 609.00Railway Projects:Sr.No. Name of the Work Contract Value (Rs. In lakhs)1 Construction of New BG Railway line in 3 sections i.e. KR-51, KR-55 &KR-57 for Koraput-Rayagada Lane. 1,421.00Ports (Harbours):1 Construction of approach Berths and Back-up area at Kakinada Port Cont-C2. 4,500.00TOTAL: 5,921.00Projects under Construction / to be executed:Road SectorWe are currently executing road sector <strong>projects</strong> amounting to Rs. 50,836 lakhs in different states, out of which work to becompleted is in excess of Rs. 40,386 lakhs. In addition, we are also executing/ allotted works in our various joint ventures(including BOT <strong>projects</strong> for which SPV have been formed or are in the process of being formed) in which our share ofcontract value works out to more than Rs. 1,66,329 lakhs, out of which our share of work to be executed is around Rs.1,35,335 lakhs which includes our share of contracts amounting to Rs. 15600 lakhs on BOT basis and Rs. 63115 lakhs onannuity basis. In addition our Company has been awarded a contract on July 7, 2006 for Rs 6517.85 lakhs for Rehabilationand upgrading of Ambikapur (km 4) to Semersot (km 65) Section in Chhattisgarh by Director, PIU, ADB Project, Raipur.48
The details of top 5 road sector <strong>projects</strong>, currently being executed by us directly and in our joint ventures, are as under:Sr. Name of the Contract Contract Value / Our Value of contractNo. share of contract to be executed(Rs. in lakhs) (Rs. In lakhs)Projects currently executed by us1 Rehabilitation and Upgrading of KM 104.000 to KM 143.630of NH-25 to 4 lane Configuaration in the State of UP 22,907 22,9072 Upgradation of Road from Hirayur to Bellary – Contract U11from KM 72.00 to KM 144.00 for Karnataka State Highwaysimprovement project 12,644 2,1943 Upgrading of Roads from Nagapattinam to Kattumavadi &New Bypasses at Nagapattinam, tiruthuraipundi and Muttupet 8,945 8,9454 Rehabilitation and Upgrading of Ambikapur (km.4) toSemersot (Km.65) Section in Chattisgarh 6,518.00 6,518.005 Road project (Road No. 19, SH 26, Khargone-Barwani 85.20,Road No. 20 SH 31, Khargone-Bistan 21 km) 5,825 5,825Projects currently in hand/ being executed by us in our various joint ventures / SPV1 Design, Construction, Development, Finance, Operation andMaintenance of Km.0.000 to 49.700 on National HighwayNo.25/26 on annuity basis 35,506 35,5062 Design, Construction, Development, Finance, Operation andMaintenance of Km.49.700 to 99.005 on National Highway No.26on annuity Basis 27,609 27,6093 4-laning from KM 93 to KM 60.00 of Bijni to WB Border Sectionof NH-31C in Assam (75% share) 18,652 18,6524 Four Lane to Meerut - Muzaffarnagar Section (KM 72.00 to KM105.00) of NH-58 in the State of Uttar Pradesh (40% share) 15,600 15,6005 4-laning from KM 60.00 to KM 30.00 of Bijni to WB BorderSection of NH-31C in Assam (75% share) 14,955 14,955Irrigation SectorWe are currently executing various irrigation <strong>projects</strong> amounting to Rs. 81,126 lakhs in different states, out of which work tobe completed is around Rs. 63,068 lakhs.Our top 5 irrigation sector <strong>projects</strong>, in terms of value of contract, are as under:Sr. Name of the Contract Location Contract Value Value of contractNo. (Rs. in lakhs) to be executed(Rs. in lakhs)1 P.P.R.M.C – Work for conducting detailed Bheemadolu, 30,130 29,730investigation, including sub-soil exploration,West Godavari, A.P.preparation of H.P’s Designs, L.P. Schedules,Drawings fixing B.M. Stones, Excavation of Canalfrom KM 71.500 to KM 105.10 (Package –4)including lining entire canal49
- Page 2 and 3:
TABLE OF CONTENTSPAGE NO.SECTION I:
- Page 4 and 5:
GAYATRI PROJECTS LIMITEDTermsBidder
- Page 6 and 7:
GAYATRI PROJECTS LIMITEDTermsDescri
- Page 8 and 9:
GAYATRI PROJECTS LIMITEDTermsBOTCAR
- Page 10:
GAYATRI PROJECTS LIMITEDTermsNSDLNS
- Page 13:
RISK FACTORSAn investment in equity
- Page 16 and 17:
GAYATRI PROJECTS LIMITED8. Our Prom
- Page 18 and 19:
GAYATRI PROJECTS LIMITEDMain Object
- Page 20 and 21:
GAYATRI PROJECTS LIMITEDWe have exe
- Page 22 and 23:
GAYATRI PROJECTS LIMITEDthe occurre
- Page 24 and 25:
GAYATRI PROJECTS LIMITED34. Some of
- Page 26 and 27: GAYATRI PROJECTS LIMITEDEXTERNAL RI
- Page 28 and 29: GAYATRI PROJECTS LIMITEDfor a secti
- Page 30 and 31: GAYATRI PROJECTS LIMITEDSteel Ltd.,
- Page 32 and 33: GAYATRI PROJECTS LIMITEDSUMMARY OF
- Page 34 and 35: GAYATRI PROJECTS LIMITEDTHE OFFERPA
- Page 36 and 37: GAYATRI PROJECTS LIMITEDFor further
- Page 38 and 39: GAYATRI PROJECTS LIMITEDSYNDICATE M
- Page 40 and 41: GAYATRI PROJECTS LIMITEDThe Hongkon
- Page 42 and 43: GAYATRI PROJECTS LIMITEDThe price d
- Page 44 and 45: GAYATRI PROJECTS LIMITEDCAPITAL STR
- Page 46 and 47: GAYATRI PROJECTS LIMITEDDate of No.
- Page 48 and 49: GAYATRI PROJECTS LIMITED4. There ha
- Page 50 and 51: GAYATRI PROJECTS LIMITED22. Not mor
- Page 52 and 53: GAYATRI PROJECTS LIMITEDLimited wil
- Page 54 and 55: GAYATRI PROJECTS LIMITEDOther Impor
- Page 56 and 57: GAYATRI PROJECTS LIMITEDDividendsIf
- Page 58 and 59: GAYATRI PROJECTS LIMITEDPursuant to
- Page 60 and 61: GAYATRI PROJECTS LIMITEDNomination
- Page 62 and 63: GAYATRI PROJECTS LIMITED3. Return o
- Page 64 and 65: GAYATRI PROJECTS LIMITEDTAX BENEFIT
- Page 66 and 67: GAYATRI PROJECTS LIMITEDcontrol reg
- Page 68 and 69: GAYATRI PROJECTS LIMITEDINDUSTRY OV
- Page 70 and 71: GAYATRI PROJECTS LIMITEDFour-laning
- Page 73 and 74: wagon drills, jack hammers, air com
- Page 75: Top 5 major assignments completed u
- Page 79 and 80: Tendering ActivityA brief flow char
- Page 81 and 82: We enter into contracts primarily t
- Page 83 and 84: S. Favouring BG No. BG Date Expiry
- Page 85 and 86: Memorandum of UnderstandingIn addit
- Page 87 and 88: project to pool in their own resour
- Page 89 and 90: Following are the number of employe
- Page 91 and 92: Syndicate OSL (ST) 1500.00 PLR + 1%
- Page 93 and 94: REGULATIONS AND POLICIESThere are n
- Page 95 and 96: OUR HISTORY AND CERTAIN CORPORATE M
- Page 97 and 98: Date of ChangeJuly 10, 1996Particul
- Page 99 and 100: Sl. Name, Designation, Father’s N
- Page 101 and 102: Compensation paid to Managing Direc
- Page 103 and 104: Management Organisation ChartKey Ma
- Page 105 and 106: Mr. Brahmaiah Lingam, D G M (Techni
- Page 107 and 108: INFORMATION OF OUR PROMOTER GROUP C
- Page 109 and 110: Banksi) Term Lenders (PNB and Andha
- Page 111 and 112: Name of Institution / Bank Principa
- Page 113 and 114: Shareholding Pattern as on August 3
- Page 115 and 116: Board of Directors1. Mr. T V Sandee
- Page 117 and 118: 9. M/s Gayatri Digisoft Technologie
- Page 119 and 120: Brief Financials(Rs. in Lakhs)Parti
- Page 121 and 122: Board of Directors1. Mrs. T. Indira
- Page 123 and 124: Brief Financials(Rs. in Lakhs)Parti
- Page 125 and 126: Indira Publications Private Limited
- Page 127 and 128:
However the firm was corporatized,
- Page 129 and 130:
Board of Directors1. Ms. T Indira R
- Page 131 and 132:
Shareholding Pattern as on August 3
- Page 133 and 134:
Brief Financials(Rs. in Lakhs)Parti
- Page 135 and 136:
Brief Financials(Rs. In Lakhs)Parti
- Page 137 and 138:
Brief Financials(Rs. in Lakhs)Parti
- Page 139 and 140:
Brief Financials(Rs. in Lakhs)Parti
- Page 141 and 142:
Brief Financials(Rs. In Lakhs)Parti
- Page 143 and 144:
Benefit of the Joint VentureTo obta
- Page 145 and 146:
Related Party Transactions as per A
- Page 147 and 148:
DIVIDEND POLICYThe declaration and
- Page 149 and 150:
SCHEDULE-ISTATEMENT OF RESTATED ASS
- Page 151 and 152:
ANNEXURE II-AConsolidated Notes to
- Page 153 and 154:
8. Related Party Transactions as pe
- Page 155 and 156:
10. Accounting for taxes on IncomeA
- Page 157 and 158:
18.3.1. Expenditure in foreign curr
- Page 159 and 160:
SCHEDULE-VCAPITALIZATION STATEMENT(
- Page 161 and 162:
SCHEDULE-IXDETAILS OF LOANS AND ADV
- Page 163 and 164:
Details of related parties:Associat
- Page 165 and 166:
MANAGEMENT’S DISCUSSION AND ANALY
- Page 167 and 168:
Our Results of OperationsAs a resul
- Page 169 and 170:
ExpenditureOur expenditure consists
- Page 171 and 172:
DepreciationDepreciation increased
- Page 173 and 174:
Status of any publicly announced Ne
- Page 175 and 176:
lakhs (for value of work done upto
- Page 177 and 178:
11. Gayatri Projects Limited vs. St
- Page 179 and 180:
V. Ramulamma vs. Gayatri Projects L
- Page 181 and 182:
Govt. of Andhra Pradesh vs. Gayatri
- Page 183 and 184:
for Loss of Profit suffered by the
- Page 185 and 186:
whether the claimant is a small sca
- Page 187 and 188:
Govt. of India and South Indian Mil
- Page 189 and 190:
and Other Claims. The total amount
- Page 191 and 192:
GOVERNMENT AND OTHER APPROVALSIn vi
- Page 193 and 194:
S. No. Name of State Type of regist
- Page 195 and 196:
(Rs. in lakhs)Financial Year 2001-0
- Page 197 and 198:
Regional Rural Banks, Co-operative
- Page 199 and 200:
Activity (Rs. In Lakhs) % of Total
- Page 201 and 202:
ii. Gayatri Sugars Limited (erstwhi
- Page 203 and 204:
OFFER STRUCTUREPublic Issue of 29,0
- Page 205 and 206:
OFFER PROCEDUREBook Building Proced
- Page 207 and 208:
The above information is given for
- Page 209 and 210:
6. Each Bid cum Application Form wi
- Page 211 and 212:
Each category of Bidders i.e. QIBs,
- Page 213 and 214:
Price Discovery and Allocation1. Af
- Page 215 and 216:
of PAN along with the application f
- Page 217 and 218:
By signing the Bid-cum-Application
- Page 219 and 220:
No separate receipts shall be issue
- Page 221 and 222:
All Bidders can seek allotment only
- Page 223 and 224:
3. For QIB BiddersBids received fro
- Page 225 and 226:
2. Direct Credit - Applicants havin
- Page 227 and 228:
As per the current regulations, OCB
- Page 229 and 230:
Such offer shall be made by a notic
- Page 231 and 232:
for all his shares of each class wi
- Page 233 and 234:
Directors, and the forfeiture shall
- Page 235 and 236:
Renewal of share warrantThe board m
- Page 237 and 238:
ALTERATION OF CAPITALIncrease of ca
- Page 239 and 240:
estrictions as the Company in Gener
- Page 241 and 242:
Chairman of general meetingWhen if
- Page 243 and 244:
P r o x yTime for deposit of instru
- Page 245 and 246:
Additional DirectorRemoval of Direc
- Page 247 and 248:
draft thereof in writing is circula
- Page 249 and 250:
Reserve and depreciation fundsDivid
- Page 251 and 252:
Service by postMember resident abro
- Page 253 and 254:
INDEMNITYEvery Director, Auditor, O
- Page 255 and 256:
11. Consent letters from Promoters,
- Page 257 and 258:
THIS PAGE HAS BEEN INTENTIONALLY LE