10.07.2015 Views

MRA Data Transfer Catalogue (DTC) Change Proposal Form - Elexon

MRA Data Transfer Catalogue (DTC) Change Proposal Form - Elexon

MRA Data Transfer Catalogue (DTC) Change Proposal Form - Elexon

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Group Group Description Range Condition L1 L2 L3 L4 L5 L6 L7 L8 Item NameOMetering Point Address Line4OMetering Point Address Line5OMetering Point Address Line6OMetering Point Address Line7OMetering Point Address Line8OMetering Point Address Line9OMetering Point Postcode1 Contract Reference1 Retrieval Method1 GSP Group ID320 Reading Cycle Details 1 If <strong>Data</strong> Collector flow G1 Regular Reading CycleORequired First ScheduledRead Date316 DC Effective Date 1 If <strong>Data</strong> Collector flow G1 Effective from Date {DCA}317 MOP Effective Date 1 If Meter Operator flow G1 Effective from Date {MOA}318 Agreed Service Details 1-* G1 Service Reference1 Service Level ReferenceNotes:Required First Scheduled Read Date is an optional field to be used where there is a service levelagreement between a Supplier and an Agent which allows the Supplier to specify the Scheduled ReadDate.This flow includes Unmetered Supply Requirements.Though all of the address data items included in this flow are defined within the structure as beingoptional, the address itself is mandatory and must be included in the flow. The use of any individualaddress item cannot be made mandatory as, in the absence of an agreed address structure for all flows,an address may be constructed from any combination of the Address Line and Postcode items.Postcode should only be omitted if the Post Office has not generated one for the premises.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!