Belgian stress tests action plan ‐ 2012‐12‐14No. Plant / Type Topic Sub‐family Sub‐sub family Action / ActivityRelatedrecommendation onEuropean level("Topics 1 to 3")Relatedrecommendation onnational level("Additional topics")StatusTarget Date560 KCD / PWR563 CNT1 / PWR564 CNT2 / PWR565 CNT3 / PWR566 KCD12 / PWR567 KCD34 / PWR568 KCD34 / PWREmergencymanagementSevere AccidentsmanagementSevere AccidentsmanagementSevere AccidentsmanagementSevere AccidentsmanagementSevere AccidentsmanagementSevere AccidentsmanagementMulti‐unit event andassociated organizationOptimization and storage of mobilemeansAn optimization study for mobile equipment and their storageinfrastructure (site or centralized) will be performed, also on the basisof the analysis of the EDMG45 In progress 31/12/2013RB protection Filtered containment vent Implementation of a filtered vent for the reactor building 3 8 LTORB protection Filtered containment vent Implementation of a filtered vent for the reactor building 3 8 In progress 31/12/2017 ?RB protection Filtered containment vent Implementation of a filtered vent for the reactor building 3 8 In progress 31/12/2017 ?RB protection Filtered containment vent Implementation of a filtered vent for the reactor building 3 8 In progress LTORB protection Filtered containment vent Study of a filtered vent for the reactor building " 8 In progress 31/12/2012RB protection Filtered containment vent Implementation of a filtered vent for the reactor building 3 8 In progress 31/12/2017 ?572 CNT / PWREmergencymanagementInfrastructureOn‐site resistant storage for mobilemeansFixed storehouse on site withstanding external aggression, for thepermanent storage of the mobile non‐conventional means necessaryfor covering the first 72 hours32 18, 32 In progress 31/12/2013573 KCD / PWREmergencymanagementInfrastructureOn‐site resistant storage for mobilemeansFixed storehouse on site withstanding external aggression, for thepermanent storage of the mobile non‐conventional means necessaryfor covering the first 72 hours32 18, 32 In progress 31/12/2013574 KCD / PWREmergencymanagementMulti‐unit event andassociated organizationComplementary means for radiologicalsurveillanceAnalyse additional means for radiological monitoring in case of asevere accident affecting several units43 In progress 30/06/2012575 KCD / PWREmergencymanagementMulti‐unit event andassociated organizationComplementary means for radiologicalsurveillanceRe‐evaluations of the performances of software calculating radiologicalconsequences will be launched to allow Corporate level to executetheir tasks more efficiently43 In progress 30/06/2012581CorporateCNT / PWREmergencymanagementMulti‐unit event andassociated organizationOrganization and logisitics of internalemergency plan in case of multi‐uniteventImplementation of the organization of the adapted emergency planand logistics28, 34, 45 In progress 31/12/2013582 CNT2 / PWR External hazards Earthquake Reinforcement of equipments anchorages Seismic walkdowns with SG&H 11 In progress 31/12/2013583 CNT3 / PWR External hazards Earthquake Reinforcement of equipments anchorages Seismic walkdowns with SG&H 11 In progress 31/12/2013584 CNT / PWR External hazardsExtreme weatherconditionsSewage capacity evaluation Sufficient draining capacity in case of heavy rainfalls 29 In progress 31/12/2013590 KCD12 / PWROperationmanagementReactor buildingReactor building overpressuremanagementPrimary circuit open: additional strategies for the management ofoverpressure in the containment building will be studied3 In progress 30/06/2013591 KCD34 / PWROperationmanagementReactor buildingReactor building overpressuremanagementPrimary circuit open: additional strategies for the management ofoverpressure in the containment building will be studied3 In progress 30/06/2013592 KCD12 / PWROperationmanagementTotal Station Black‐outProcedures in case of total station blackoutImplement the organization of the response to this type of nonconventionalaccident ‐ complete SBO (management of equipment,documents, etc.)25 In progress 31/12/2013Implementation of activities18/20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!