10.07.2015 Views

report

report

report

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Belgian stress tests action plan ‐ 2012‐12‐14N° ENSREG Topic Source ENSREG Peer Review Recommendations and Suggestions Action description : Family ‐ subfamily ‐ sub‐subfamilyAction to beimplementedComment15Design issuesENSREG compilation ofrecommendations, xCNSAC Power SuppliesThe enhancement of the on‐site and off‐site power supplies.Power supply ‐ Total Station Black‐out ‐ Implementation of a 380 Vemergency electrical gridPower supply ‐ Total Station Black‐out ‐ Turbopomp power supplybackupPower supply ‐ Varia ‐ Impact of the configuration and operationof High Voltage grid on the auxiliaries of NPP's503, 550, 97, 98, 99,100, 480, 481, 482,483, 484, 485, 492,493, 598, 599, 600,609, 610, 611Both on‐site and off‐site powersupply will be enhanced.16 Design issuesENSREG compilation ofrecommendations, xCNSDC Power SuppliesThe enhancement of the DC power supply.Power supply ‐ Batteries autonomy ‐ Increasing battery autonomy397, 398, 501, 502,594, 595Power supply ‐ EDG autonomy ‐ On‐site fuel transport17Design issuesENSREG compilation ofrecommendationsOperational and Preparatory ActionsImplementation of operational or preparatory actions with respect to theavailability of operational consumables.Power supply ‐ EDG autonomy ‐ Procedures to manage theautonomy of electrical diesel generatorsPower supply ‐ EDG autonomy ‐ Procedures to manage theautonomy of electrical diesel generators in SUR81, 82, 83, 84, 89,48918Design issuesENSREG compilation ofrecommendations, xCNSInstrumentation and MonitoringThe enhancement of instrumentation and monitoring.External hazards ‐ Flooding ‐ Additional means against extremeflooding (pumps, diesel generators,…)Power supply ‐ Total Station Black‐out ‐ Autonomous generator torecharge the instrumentationPower supply ‐ Total Station Black‐out ‐ Spent fuel pools :additional level measurements64, 65, 104, 105,106, 176, 177, 17819Design issuesENSREG compilation ofrecommendationsShutdown ImprovementsThe enhancement of safety in shutdown states and mid‐loop operation.Power supply ‐ Total Station Black‐out ‐ Reactor buildingconfinementWater supply ‐ Total Station Black‐out ‐ Additional means toassure primary water supply111, 112, 498, 551Shutdown states and mid‐loopoperation were considered asinitial states in the stress test.Appropriate actions were definedto further enhance safety in thesestates.20 Design issuesENSREG compilation ofrecommendations, xCNSReactor Coolant Pump SealsThe use of temperature‐resistant (leak‐proof) primary pump seals.Study of RCP pump seal leakage following long term AC power failure.Operation management ‐ Total Station Black‐out ‐ Procedures incase of total station black‐out128, 129, 130Topics 1 to 33/7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!