10.07.2015 Views

Cedar Crossing Industrial Park - Gisplanning.net

Cedar Crossing Industrial Park - Gisplanning.net

Cedar Crossing Industrial Park - Gisplanning.net

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project InformationLocation35-minute drive from Downtown Houston, adjacent to Baytown, Texas Citylimits, located in Chambers CountyGeneral Info• 15,000 acres (±12,000 acres available)• Tracts from 1 acre - 2,000+ acs.• Flat, excellent-drainage - minimal flood-plain issuesForeign Trade Zone• <strong>Cedar</strong> <strong>Crossing</strong> has secured a 200-acre Foreign Trade Zone designation.Freeway Access• Interstate 10 is eight minutes to the north via Grand <strong>Park</strong>way (SH 99)• Intersection of State Highway 225 and 146 is eight minutes to the south• 12-mile segment of the Grand <strong>Park</strong>way (SH 99), Houston's third circumferentialfreeway, is completed with 5.5. miles within the park connecting SH146 & Interstate 10Air Transportation• Supported by William P. Hobby, Ellington Field and George BushIntercontinental airportsRail Access• Access to Union Pacific and Burlington Northern Santa Fe railroad <strong>net</strong>works• 56 miles of private operating track within the <strong>Park</strong>• Over 1,500 rail car storage facility operated by Econorail with easy expansionavailablePort Access• Three barge terminals within the <strong>Park</strong> - three-hour access to Barbour’s CutContainer Terminal and the Houston Ship Channel• Barbour’s Cut Terminal is a 12-minute drive from the park• Bayport Terminal is a 16-minute drive from the parkCushman & Wakefield of Texas, Inc.1330 Post Oak Boulevard, Suite 2700Houston, Texas 77056Phone 713.877.1700 • Fax 713.877.1965Utilities• Chambers County <strong>Industrial</strong> District #1 provides sanitary sewer and potablewater in the park• <strong>Industrial</strong> water on property 170 million GPD via canal; 36” supply line; 5-10million GPD via Coastal Water Authority• Electric: 138kV distributed throughout the parkFeedstock Access• Traversing chemical and gas feedstock pipelines connect to the largestsource of feedstock supply in the worldB. Kelley <strong>Park</strong>er, III, SIORExecutive Vice President713.963.2896kelley.parker@cushwake.comJohn F. Littman, SIOR, MAISenior Director713.963-2862john.littman@cushwake.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!