10.07.2015 Views

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>NWP</strong> 4-<strong>01.4</strong><strong>REPLENISHMENT</strong> CHECKLISTBridge1. Ensure rudder operational PMS check has been conducted within 48 hours of UNREP. ____2. Notify EOOW of expected approach speed and speed requirement uponcompletion. Verify plant lineup for evolution.____3. Cargo and personnel manifest available on bridge (if applicable). ____4. Fuel type and quantity requirement posted on bridge. ____5. As applicable: Set the replenishment detail. ____6. Post name, rank, lineal number of all commanding officers and the name, hullnumber, voice call of all ships on status board.____7. Test bullhorn and place in vicinity of captain’s chair. ____8. Ensure sound-powered circuits and engineering “E” call sound power circuitsare tested and set up.____9. Take assigned waiting station as directed by OTC. ____10. PQS qualified master helmsman at the helm. Helm safety supervisor on station. ____11. Determine replenishment order. ____12. Set HERO condition, if applicable. ____13. Receive manned and ready reports from main control, cargo control, aftersteering, bridge, replenishment stations and departmental reports. Setrestricted maneuvering conditions, when directed.14. ROMEO at dip, ready to go alongside (300 to 500 yards (274 to 457 m)).(Flashing light at night.)15. ROMEO at close-up, commencing approach. Haul up day shapes (at night turnon task and contour lights, signal ROMEO by shielded directional signallamps or Nancy).16. Pass the word over the IMC: “On the (name of ship); stand by for shot line(s),(port/starboard side, fwd, aft, midships, all stations); all hands topside take cover.”17. When first messenger is in hand, haul down ROMEO. Put smoking lamp outwhile refueling or handling of ammunition.____________________18. Fifteen minutes prior to disengaging, receiving ship only, PREP at the dip. ____D-15 ORIGINAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!