10.07.2015 Views

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>NWP</strong> 4-<strong>01.4</strong><strong>REPLENISHMENT</strong> CHECKLISTBurton Station # ____(For night replenishment, include supplemental checklist.)1. Ensure that whip is free of kinks and is spooled on the drum with no riding turns. ____2. Check operation of cargo hook. ____3. Have all swivels free and well lubricated. ____4. Have all shackles properly secured. ____5. Fake messengers down for running. ____6. Have line-throwing gun and one bolo at each station to be used. Test line-throwinggun and examine firing pin. Have extra projectiles and shot lines on hand.____7. Rig station marker. ____8. Have signal paddles available. ____9. Fake down phone line, and test phone. ____10. Test all winches. ____11. Have bulwark gripper available. ____12. Have required station tools available. ____13. Have cargo nets, net shorteners, skip box and transfer bag available, as required. ____14. Muster personnel assigned. ____15. Ensure that a green chemical light or one-cell white flashlight, a whistle, and adye marker are attached to each life jacket in use.____16. Make readiness report to first lieutenant. ____Remarks:D-11 ORIGINAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!