10.07.2015 Views

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>NWP</strong> 4-<strong>01.4</strong><strong>REPLENISHMENT</strong> CHECKLISTSTREAM Station # ____(For night replenishment, include supplemental checklist.)1. Ensure that wires are free of kinks and are spooled on the drum with no ridingturns. Additionally, ensure that winch clutches are engaged and that clutch engaginglevers are secured in place with toggle pins.____2. Test winches and sliding block in accordance with approved SQT procedures. ____3. Ensure that trolley, cargo drop reel, cargo hook, messenger-rigged STAR,traveling SURF, and STREAM manila or Burton outhaul are properly rigged.____4. Ensure that inhaul is in tension mode. ____5. Check pelican hook for ease of operation and presence of cotter pin. ____6. Ensure that the STAR messenger is faked down for running and properlyattached to the rig.7. Have line-throwing gun and one bolo at each station to be used. Test line-throwinggun and examine firing pin. Have extra projectiles and shot lines on hand.________8. Rig station marker. ____9. Have signal paddles available. ____10. Fake down phone line, and test phone. ____11. Have required station tools available. ____12. Have cargo nets, net shorteners, skip box, and transfer bag available, as required. ____13. Muster personnel assigned. ____14. Ensure that a green chemical light or one-cell white flashlight, a whistle, and adye marker are attached to each life jacket in use.____15. Make readiness report to first lieutenant. ____Remarks:D-10 ORIGINAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!