10.07.2015 Views

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>NWP</strong> 4-<strong>01.4</strong><strong>REPLENISHMENT</strong> CHECKLISTEngineering Department1. Light off additional boilers, as necessary. ____2. Put generators on the line, as required. ____3. Warm up all deck machinery. ____4. Maintain fire-main pressure at 100 psi (689.4 kPa). ____5. Lead out and inspect necessary firefighting equipment. ____6. Check all sound-powered phones and circuits that will be used, both intership and intraship. ____7. Warm steam cargo pumps. Test all pumps, including electrical. Recirculate oil (AO). ____8. Make readiness report to OOD. ____9. Set restricted maneuvering conditions, when directed. ____Remarks:D-4 ORIGINAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!