10.07.2015 Views

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>NWP</strong> 4-<strong>01.4</strong>1. On signal from the receiving station, haul in the trolleyand empty chair with the inhaul and two-blockthe trolley to the STREAM transfer head.2. For inhaul winch with slip clutch only: Putwinch in tension control.3. For Navy standard hauling winch only: Slowlymove SPEED control handle to haul-in HALFSPEED detent and leave in detent.4. Lower the transfer head to bring the empty chairto the deck.(9) BOTH SHIPSPersonnel STREAM with hand-tended outhaul isready for transfer of personnel.8.4.5 Operating Personnel STREAM WithHand-Tended Outhaul. To transfer passengers,repeat the procedures for cycling the empty chair.When using the cargo drop reel for transfers from afixed-padeye receiving station to a STREAM slidingblock, personnel at the fixed-padeye receiving stationload the chair as follows:1. Pull the brake release lanyard.2. Pull down on the tag lines to lower the emptychair to the deck.3. Load the passenger.4. Pull the lanyard and have 2 to 4 personnel lift thechair while the cargo drop reel retracts.5. When the chair has been lifted as high as personnelcan lift it, release the lanyard to set the cargodrop reel’s brake.6. Signal the inhaul winch operator (on the othership’s station) to haul in the chair.8.4.6 Retrieving Personnel STREAM WithHand-Tended Outhaul and ConnectingSTREAM With Traveling SURF(1) DELIVERY SHIP1. Retrieve the trolley and two-block it against thetransfer head.2. For inhaul winch with slip clutch only: Placewinch in tension control.3. For Navy standard hauling winch only: Slowlymove SPEED control handle to haul-in HALFSPEED detent and leave in detent.4. Lower transfer head until the chair reaches thedeck; remove chair and wire preventer.5. Remove the messenger/outhaul from the trolleyand secure temporarily to bulwark. (Receivingstation must hand tend the messenger slack.)6. For hand-tended inhaul only: Hold trolley in placeand disconnect hand-tended inhaul from trolley.Connect wire rope inhaul from inhaul winch.7. For Navy standard hauling winch only:a. Move SPEED control handle from HALFSPEED detent to centered position.b. Pressurize outhaul drum clutch by movingmanual vent valve V-21 (see Figure 8-7)down to the NORMAL position.c. Place MASTER STATION SELECTORSWITCH in OUTHAUL DRUM ONLYposition.8. Reeve wire rope outhaul through the SURF andattach the traveling SURF to the highline.NoteIt is helpful to place the SURF on a palletand use a forklift to raise it to the highline.9. Attach the outhaul to the trolley.10. Disconnect messenger at bulwark and attach themessenger to SURF. (Refer to Figure 6-22.)(2) RECEIVING SHIP1. Haul in the messenger to pull the SURF across.2. When the SURF is two-blocked against the stopperplate, attach the SURF hook to the bail on the bottomof the STREAM pelican hook. (Refer to Figure 6-23.)3. Slack the messenger and disconnect it from theSURF pendant.4. Fake out the messenger free for running.5. Stand clear of the rig.8-10 ORIGINAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!