10.07.2015 Views

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>NWP</strong> 4-<strong>01.4</strong>transfer head. Inhaul winch remains in tensioncontrol.When the outhaul winch is switched fromtension control to speed control, the winchbrake automatically sets if the controlhandle is in neutral. Therefore, perform thenext step exactly as described or a tightlinecondition can develop.2. Move the outhaul winch’s control lever to the payoutposition, and then switch to speed control inaccordance with installed STREAM systeminstructions.3. Slack the outhaul and tend.(2) RECEIVING SHIP1. On signal, haul in on the releasing line to takethe strain off the SURF hook.NoteIf rigged to a sliding padeye, lower the slidingpadeye, remove the sail twine securing thereleasing line to the 7/8-inch (22.2 mm) screwpin anchor shackle, and uncoil the releasingline. Haul in on the releasing line to take thestrain off the SURF hook.2. Disconnect the SURF hook from the bail of theSTREAM pelican hook.3. Ease the SURF outboard with the releasing lineand cast free.(3) DELIVERY SHIPWARNINGWARNINGThe SURF must be released from thereceiving station before the trolley arms areclosed and secured.1. Haul in the outhaul to retrieve the SURF.2. When the SURF reaches the delivery station,move the transfer head to the full-down positionand engage the trolley stowage arms.3. Raise the transfer head to the full-up position.(4) RECEIVING SHIPNotify the bridge and delivery station: “Ready todetension highline.”(5) BOTH SHIPSProcedures for detensioning the highline are given inparagraph 6.9.4 (5), steps 1 through 6.(6) DELIVERY SHIPWhen the highline is slack, signal the receiving stationto trip the pelican hook. Prior to tripping the pelicanhook, the delivery station rigs a lizard line to the highlineand belays it to ensure a proper fairlead into the trolley.The receiving station must not trip the pelicanhook until the highline is slack and the signalhas been given by the delivery station.(7) RECEIVING SHIP1. On signal, haul in on the easing-out line to takethe strain off the pelican hook. (If the highline isattached to a sliding padeye, lower the slidingpadeye and break the sail twine that holds thecoiled easing-out line. Haul in on the easing-outline to take the strain off the pelican hook.)2. Trip the pelican hook.3. Ease the highline clear of the deck edge and releasethe easing-out line.4. Signal the delivery station to haul in the highlineand the station phone line.(8) DELIVERY SHIP1. Haul in the highline and the station phone line.2. Disconnect the phone/distance line.(9) RECEIVING SHIPWARNINGHaul in the phone/distance line.6-39 ORIGINAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!