10.07.2015 Views

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>NWP</strong> 4-<strong>01.4</strong>OUTHAULSTAR LATCHASSEMBLYHIGHLINE SHEARPIN ADAPTERWITH50,000 LB(22,675 kg)SHEAR PINSTAR PROBESTANDARD 1-3/8"(34.9 mm)PELICAN HOOKHIGHLINERECEIVING SHIP'SLONG LINKSURFSTAR MESSENGERFigure 6-16. STREAM With STAR When Highline Winch Has No Slip Clutch in Drum — Major Assemblies9. Cock both STAR latches by pushing the latchestoward the SURF. (See Figure 6-18.)10. Fake out the STAR messenger (shown in Figure2-9). Attach the inboard end of the messenger tothe messenger padeye on the SURF. Stop off thehighline to the messenger 350 feet (106.6 m)from the inboard (shackled) end of the messenger.Stop off first to the probe fitting guide ring(see Figure 6-19). Place the next stop on thehighline just inboard of the probe fitting. Thenplace one more stop about 12 inches (30.5 cm)inboard of the second stop.11. Attach the station phone line and the lead line messengerfor the phone/distance line (if required).12. Ensure that all necessary working and repair toolsand safety equipment are on station and that personnelare briefed, properly dressed, and on station.(2) RECEIVING SHIP1. Install the fairlead block for the messenger.2. Install the deck fairlead snatch blocks.3. Ensure that all necessary working and repairtools and safety equipment are on station andthat personnel are briefed, properly dressed, andon station.6. At a pendant receiving station, rig the pendant.5. Provide an easing-out line on station. See paragraph2.2.11.5.6.9.2 Passing STREAM With STAR(1) DELIVERY SHIP. (See Figure 6-20.)1. With the STREAM transfer head in the down position,switch the inhaul winch to tension controland the outhaul winch to speed control.The inhaul winch must be in tension controlbefore moving the STREAM transfer head.2. Send over the shot line attached to themessenger.(2) RECEIVING SHIPWARNING1. Receive the shot line and haul in. When the messengercomes aboard, install the messenger inthe rigging and fairlead blocks and continue tohaul in.2. When the station phone line and the lead linemessenger for the phone/distance line comeaboard, disconnect them and move them clear ofthe area.3. Attach the phone/distance line to the lead line messengerand signal the delivery station to haul in.6-25 ORIGINAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!