10.07.2015 Views

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>NWP</strong> 4-<strong>01.4</strong>SHIPAO-177 thru AO-180and AO-186STATIONRAM FLASKPRESSUREIN PSI(kPa)(1) (2) (3)3, 4 1,950(13,436)AOE-1 thru AOE-4 1, 5, 6, 10, 11, 14, 18 1,950(13,436)AOE-6 thru AOE-8 andAOE-10T-AO-187 thru T-AO-204T-AE-26 and AE-27 thruAE-291, 4, 5, 6, 9, 12 1,950(13,436)3, 4 1,950(13,436)3, 4, 5, 6, 8, 9, 10 1,950(13,436)AE-32 thru AE-35 3, 4, 5, 6, 8, 9, 10 1,950(13,436)T-AFS-1, -3, -4, -7 2, 4, 5, 7, 8, 10 1,950(13,436)T-AFS-2 and -6 2, 4, 5, 6, 7, 8, 10 1,950(13,436)T-AFS-5 2, 45, 6, 7, 8, 101,950(13,436)1,250(8,613)MAXIMUM SAFE LOAD IN POUNDS (kg) (2) (4)SEA STATE CALM to3 SEPARATION60 ft — 120 ft(18.3 — 36.6 m)8,750(3,969)8,750(3,969)8,750(3,969)8,750(3,969)8,750(3,969)8,750(3,969)8,750(3,969)8,750(3,969)8,750(3,969)5,600(2,540)SEA STATE 3 to 5SEPARATION120 ft — 150 ft(36.6 — 45.7 m)5,700(2,586)5,700(2,586)5,700(2,586)5,700(2,586)5,700(2,586)5,700(2,586)8,750(3,969)5,700(2,586)5,700(2,586)3,700(1,678)NOTES: (1) Ram pressure with ram in down (secured) position.(2) Maximum ram pressure and maximum load transfer to receiving ship padeye testedto 50,000 pounds (22,675 kg). For receiving ships with padeye tested to less than50,000 pounds (22,675 kg), see Figure B-2 for ram pressures and maximum transferloads.(3) Data contained in parentheses reflects units in kiloPascal (kPa).(4) Data contained in parentheses reflects units in kilograms (kg).Figure 6-1. Ram Tensioner Air Pressure for STREAM Stations Transferring Solid Cargo and MissilesReplenishment ships can transfer loads weighing upto the capacity of the CDR (5,700 lb (2,584 kg)) to receivingships with STREAM receiving stations statictested to 50,000 lb (22,675 kg), so long as the load willclear the deck edge of the receiving ship.Decrease these load capacities to loads shown inAppendix B, Figure B-2, when replenishing under adversesea and weather conditions or when thereceiving station padeye is tested to less than 50,000 lb(22,675 kg).6.1.4 Heavy-Lift Transfer. Loads weighing over5,700 lb (2,584 kg) require special consideration fortransfer by STREAM rig. The procedures to be employedfor heavy-lift transfer (including aircraft engines)by STREAM rig are described in paragraph6.17. Heavy Burton is a viable method for heavy-lift6-2 CHANGE 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!