10.07.2015 Views

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>NWP</strong> 4-<strong>01.4</strong>CHAPTER 6Solid Cargo Transfer — STREAMRigging and Operation6.1 BASIC CONSIDERATIONSA number of different methods can be used for transferof solid cargo between ships. The preferred methodis STREAM, when both the delivery ship and the receivingship have the capability to use it.This chapter covers transfers of solid cargo betweenU.S. Navy ships, including MSC ships, and selectedmerchant ships using the STREAM rig. This chapteralso covers transfers of ammunition, missiles, and theircomponents. Solid cargo may also be transferred usingone of the Burton methods in Chapter 5. For transfers ofsolid cargo between ships of the NATO nations, seeATP 16.6.1.1 Rig Selection. Select the rig to be used for aparticular replenishment operation on the followingbases:1. Type and quantity of cargo2. Capacity of the rig and associated fittings3. Weight of the heaviest load and size of the largestload4. Weather and sea conditions at the time oftransfer5. Type and location of receiving station.STREAM rigs in order of preference are:1. STREAM with all-tensioned wiresa. Traveling SURFb. STAR (preferred for non-sliding padeyestations)For data on transfer stations, which is useful in selectingthe rig, refer to these sources:1. UNREP Station Capabilities Handbook,NAVSEA S9571-A1-HBK-0102. Fleet Underway Replenishment Guide, COMNAV-SURFPACINST 3180.2 or COMNAVSURF-LANTINST C9010.1 series.The requirements of the following paragraphs applyto the type of STREAM rig selected.6.1.2 Wire Rope. Wire rope used in STREAM rigsis in accordance with paragraph 2.3.1. Sizes and lengthsfor various rigs are specified in the table below.WIREROPEHIGHLINE(Note)SIZE ININCHES(mm)1(25.4)INHAUL 1/2 (12.7)3/4 (19.0)MINIMUMLENGTH INFEET (m)800(243.8)800(243.8)OUTHAUL 1/2 (12.7) 1,200(417.6)Note: Only certified highlines (NSN 4010-01-309-7439) are to be installed.6.1.3 Rig Load Capacities and Highline WireRope Safety. The safe load conditions and ramtensioner pressure settings are given in Figure 6-1.Safety of the rig depends on highline wire rope inspectionand periodic replacement. Criteria are in eachship’s PMS and must be adhered to strictly.2. STREAM with hand-tended outhaul.6-1 CHANGE 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!