10.07.2015 Views

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>NWP</strong> 4-<strong>01.4</strong>ROPE PENDANTFWDFUEL ORWATER RISERPROBE RECEIVERAND SWIVEL ARMSPANWIRE ASSEMBLYFROM DELIVERY SHIPFigure 4-10. Auxiliary Fuel Rig (Under STREAM Rig) at Receiving Station4.12.7 Accidental Disengagement1. By design the probe rig and auxiliary hose rig willdisengage if 2,500 lb (1,134 kg) or 500 lb (227 kg)respectively is induced to the hose at the receiver.2. Cease pumping.WARNING• The deck may be wet as a result of theuncoupling.• Wait until the force that caused the separationis no longer present.3. Signal the delivery ship to ease out on the retrieverwhip.4. Haul in on the remating line until the probe(s)engage.5. Gaff the auxiliary hose if outboard and bring itaboard.6. Vent the delivery hose at the automatic couplingby draining trapped fluid into a drip pan.7. Connect the autotension coupling.8. Stand clear and signal to resume pumping.4-20 ORIGINAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!