10.07.2015 Views

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>NWP</strong> 4-<strong>01.4</strong>PageNo.CHAPTER 7 — SOLID CARGO TRANSFER — BURTON RIGGINGAND OPERATION7.1 BASIC CONSIDERATIONS ..................................7-17.1.1 Rig Selection ...........................................7-17.1.2 Wire Rope ............................................7-17.1.3 Rig Load Capabilities ......................................7-17.1.4 Rig Fittings ............................................7-17.1.5 Catenary .............................................7-17.1.6 Return of an Empty Cargo Hook. ................................7-27.2 LOADING AND HANDLING OF CARGO ..........................7-27.3 PREPARING SHIPS FOR TRANSFER. ............................7-57.3.1 Rigs and Fittings .........................................7-57.3.2 Personnel Duties .........................................7-57.3.3 Transfer at Night .........................................7-57.4 BURTON METHODS ......................................7-57.4.1 Conditions for Burtoning. ....................................7-57.5 BASIC BURTON ........................................7-57.5.1 Rigging the Receiving Station ..................................7-77.5.2 Passing the Lines .........................................7-87.5.3 Transferring the Load ......................................7-87.5.4 Retrieving the Rig ........................................7-87.5.5 <strong>Ships</strong> Rigged for STREAM ...................................7-97.6 HEAVY BURTON. .......................................7-97.6.1 Single-Whip, 6,000 lb (2,721 kg), Burton Transfer .......................7-97.6.2 Heavy-Lift/Double-Whip, 12,000 lb (5,442 kg), BurtonTransfer. .............................................7-97.6.3 Basic Double-Whip (Two-Boom) Rig .............................7-117.6.4 Alternate Double-Whip (Boom-and-Kingpost) Rig ......................7-137.7 EMERGENCY BREAKAWAY PROCEDURES FORBURTON RIGS. ........................................7-157.7.1 Single Burton ..........................................7-157.7.2 Heavy-Lift Burton (Two Double Whips) ............................7-157.7.3 Heavy-Lift Burton (One Wire, Single-Part) ..........................7-157.7.4 Heavy-Lift Burton (Both Wires, Single-Part) .........................7-157.7.5 Heavy-Lift Burton (Power Not Available) ...........................7-157.8 REFERENCES .........................................7-15CHAPTER 8 — PERSONNEL TRANSFER — STREAM RIGGING ANDOPERATION8.1 BASIC CONSIDERATIONS ..................................8-18.2 TRANSFER OF PERSONNEL BY STREAM RIG. ......................8-115 CHANGE 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!