10.07.2015 Views

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

UNDERWAY REPLENISHMENT NWP 4-01.4 - Historic Naval Ships ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>NWP</strong> 4-<strong>01.4</strong>FAIRLEADBLOCKSEE FIGURE 3-12 FOREND FITTING DETAILSRIDING LINEFREETROLLEYSPANWIREPELICAN HOOKTWO-FOLDPURCHASETHREE-HORNCLEAT (TWO-HORN OPTIONAL)(SEE FIG. 3-15)FUEL RISER9' (2.7 m) 4' (1.2 m)HOSEHOSEROBB COUPLING (SEE FIG. 3-10)Figure 4-2. Securing the Single Hose With Robb Coupling5. Secure the 6-foot (1.8 m) tail of the stationphone line to a cleat at the bulwark.6. Fake out the messenger return line and attach itto the messenger return line pendant around theprobe tube at the trolley carriage, as shown inFigure 3-23.7. Ensure that all probe latches are latched.8. Ensure that all necessary rigging, working andrepair tools, and safety equipment are on stationand that personnel are briefed, properly dressed,and on station.(2) RECEIVING SHIP1. Install a 12-inch (30.5 cm) wood or steel messengerfairlead block (see Figure 3-26).2. Install deck fairlead snatch blocks (as necessary)and prereeve small stuff for the messenger lead.3. When receiving probe, remove the cover fromthe probe receiver and verify that the seal in thebell housing is not damaged and is lubricated.4. Provide an easing-out line on station for the spanwire. See paragraph 2.2.11.5.5. Ensure that all necessary rigging, working andrepair tools, and safety equipment are on stationand that personnel are briefed, properly dressed,and on station.4.9.3 Passing the Nontensioned SpanwireFuel Rig. A receiving ship with deck-loaded aircraftwill provide all shot lines and bolos. When the receivingship provides an individual shot line for a remotelylocated phone/distance line, it attaches the lead linemessenger to the zero end of the phone/distance lineand then to the shot line. The delivery ship hauls overthe line.When the delivery ship provides an individual shotline for a remotely located phone/distance line, it passesthe shot line with the lead line messenger for the phone/distance line attached. When the lead line messenger isreceived on board, the receiving ship disconnects thelead line messenger, attaches it to light line at the zeroend of the phone/distance line, and signals the deliveryship to haul in.(1) DELIVERY SHIP1. Position the Nos. 1, 2, and 3 saddle trolleys forsmooth fairleading of the span wire.2. Send over the shot line and attach it to themessenger.4-3 ORIGINAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!