10.07.2015 Views

Broadwater Wastewater Management Strategy Presentation

Broadwater Wastewater Management Strategy Presentation

Broadwater Wastewater Management Strategy Presentation

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Broadwater</strong> <strong>Wastewater</strong> <strong>Management</strong> <strong>Strategy</strong>6. Connection to Evans Head STPProvision has been made for the future connection of<strong>Broadwater</strong> sewer to the new STP at Evans Head. A200mm dia pipe will be allowed for in the construction ofthe inlet works at the new STP which will cater for thisfuture connection.Allowance has been made in the design of the new STPfor future sewer loads to be accepted from <strong>Broadwater</strong>.Sewer will need to be pumped via a 9.6Km long risingmain from <strong>Broadwater</strong> to the new STP at Evans.A return line to <strong>Broadwater</strong> can be laid in the sametrench for future return of effluent for reuseRVC May 2006

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!