10.07.2015 Views

Sigma-II Series SGM*H/SGDH USER'S MANUAL - Esco Drives ...

Sigma-II Series SGM*H/SGDH USER'S MANUAL - Esco Drives ...

Sigma-II Series SGM*H/SGDH USER'S MANUAL - Esco Drives ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11.2 Connection to Host Controller11.2.10 Example of Connection to MITSUBISHI’s AD75 Positioning Unit(SERVOPACK in Position Control Mode)Positioning unit AD75manufactured byMitsubishi+24VX-axis (Y-axis)I/O power supply26714112425+ -READYSTOPDOGPGO1Ry+24 V024VON whenpositioning iscanceled.ON whenproximity isdetected.PCO/PCO<strong>SGDH</strong> SERVOPACKCN11920L1CL2CL1L2L3UVWControlpower supplyMain circuitpower supplyServomotorA(1)B(2)MC(3)D(4)1RyALM+31CN2PGALM -32321422523PULSESIGNCLEAR2.2KPULS/PULSSIGN/SIGNCLR/CLR7811121514CN147404243/S-ONP-OTN-OT+24V024V* The ALM signal is output for about two seconds when the power is turned ON. Take this into considerationwhen designing the power ON sequence. The ALM signal actuates the alarm detection relay 1Ryto stop the main circuit power supply to the SERVOPACK.Note: Only signals applicable to Mitsubishi’s AD75 Positioning Unit and Yaskawa’s <strong>SGDH</strong> SERVO-PACK are shown in the diagram.1111-25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!