Download
Download Download
Potential to mapping riverbed topography• Contour mapping under relatively clean water• Considering the refractive index of waterContour lines beneath river waterIdentification of rapids, pools, etc. in river channels
Estimation of water budget of Tonle SapLake in CambodiaCarbonnel & Guiscafire (1962-63)Inflow fromwatershed 243Evap. 104 Rain 139Tonle Sap LakeNormal flow 729Main channnl ofThe Mekong River4,000Area of Tonle Sap Lake67,000km 2Inverse flow 450Unit of water volume 0.1 billion m 3
- Page 3: Contents of Project-22.1 Remote Sen
- Page 6 and 7: Studies at PWRIrelated to2.1 Remote
- Page 8 and 9: Study area (Chuetsu District of the
- Page 10 and 11: Relationship between normalizedsumm
- Page 12 and 13: SWE-rank classification map(1997-98
- Page 14 and 15: Studies at PWRIrelated to2.1 Remote
- Page 16 and 17: 2. River monitoring1)Super high-res
- Page 18 and 19: Land cover classification and detec
- Page 20 and 21: Contents of TLS studies at PWRI•
- Page 22 and 23: Topography mapping with TLSwith thr
- Page 24 and 25: Investigation of river-bed material
- Page 28 and 29: Main water-stage observatoriesnear
- Page 30 and 31: Study AreaCambodia, Tonle Sap Lake
- Page 33 and 34: Estimation of flood inundationof th
- Page 35 and 36: BackgroundDistributed-parameter mod
- Page 37 and 38: Development of basin-wide distribut
- Page 39 and 40: Characteristics of hydrologicproces
- Page 41 and 42: Actual evapotranspiration (Ea)= Pen
- Page 43 and 44: Net Radiation: Rn ’ ’”
- Page 45 and 46: Soil moisture accounting (wet perio
- Page 48 and 49: Location of the254km 2Kusaki-Damwat
- Page 50 and 51: River-channel networks for Kusaki-D
- Page 52 and 53: NDVI map for the Kusaki-Dam watersh
- Page 54 and 55: Vegetation cover ratio map based on
- Page 56 and 57: Long-termstreamflowsimulation witht
- Page 58 and 59: Long-term streamflow simulationwith
- Page 60 and 61: Characteristics of WEHY model• He
- Page 62 and 63: Model computational unitsSoilparame
- Page 64 and 65: Field survey for ground-truth data
- Page 66 and 67: Verification cases of WEHY modelat
- Page 68 and 69: Conclusions• A priori estimation
- Page 70 and 71: General weather situation• Autu
- Page 72 and 73: 1 Collect the rainfall data Ho
- Page 74 and 75: 2DD (Depth-Duration) analysis• So
Estimation of water budget of Tonle SapLake in CambodiaCarbonnel & Guiscafire (1962-63)Inflow fromwatershed 243Evap. 104 Rain 139Tonle Sap LakeNormal flow 729Main channnl ofThe Mekong River4,000Area of Tonle Sap Lake67,000km 2Inverse flow 450Unit of water volume 0.1 billion m 3