Section 2 <strong>Scanner</strong> ® <strong>2000</strong> microEFM<br />

34<br />

b. Position the manifold so that all valves are accessible from the front of the instrument.<br />

4. Install tubing and fittings to connect the <strong>Scanner</strong> <strong>2000</strong> and manifold assembly to the differential pressure<br />

meter, sloping the gauge lines downward to the meter at a minimum of one inch per foot. Use a suitable<br />

compound or tape on all threaded process connections.<br />

5. Install the explosion-proof Barton Model 21 RTD assembly in the thermowell. Route the RTD assembly<br />

cable through the conduit opening in the top of the <strong>Scanner</strong> <strong>2000</strong> to connect to the main circuit board.<br />

(If the Barton Model 21 series is not used and the <strong>Scanner</strong> <strong>2000</strong> is in a hazardous area, a Barton Model<br />

20 RTD terminal housing or similar alternative must be used. In this case, the RTD signal cable must be<br />

routed through conduit and a conduit seal must be installed within 18 in. of the <strong>Scanner</strong> <strong>2000</strong>. A wiring<br />

diagram for the RTD assembly is provided in Figure 3.5, page 64.<br />

6. Route any additional inputs/outputs or COM connections, etc. through the conduit opening in the top of<br />

the <strong>Scanner</strong> <strong>2000</strong>. In hazardous environments, add a conduit seal within 18 in. of the <strong>Scanner</strong> <strong>2000</strong>.<br />

7. Perform a manifold leak test as described on page 52.<br />

8. Verify the zero offset, if required (and other calibration points, if desired). See the ModWorX Pro Software<br />

User Manual, Part No. 9A-30165025, for complete instructions. See also Zero Offset (Static Pressure<br />

or Differential Pressure), page 53, Static Pressure Calibration and Verification, page 53, and Differential<br />

Pressure Calibration and Verification, page 54.<br />

CAUTION Do not put the <strong>Scanner</strong> into operation until the valves are positioned properly so that<br />

pressure is supplied to both sides of the MVT. For instructions on proper valve positions,<br />

see Placing the <strong>Scanner</strong> into Operation, page 55.