10.07.2015 Views

integrated coastal zone management project west ... - Iczmpwb.org

integrated coastal zone management project west ... - Iczmpwb.org

integrated coastal zone management project west ... - Iczmpwb.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

188Total (excluding cost towards electrical works, goods & equipment,operation & maintenance and monitoring & evaluation) 1493.72Component B.5 - Provision of grid electricity to Sagar Island234. Sagar Island depends on diesel generating sets for electricity requirement andelectricity is available for a part of the population on an <strong>org</strong>anized scale only during theevening hours. However, during Sagar mela in January every year, power supply continuesthroughout evening and night hours.235. The existing distribution system comprises 20 no 11/0.433 K.V. distribution substationswith 44 km 11 K.V. feeder and 26 km M & L.V. lines catering power to domestic,commercial and industrial consumers. The inadequacy of power supply is at the root of anysubstantial developmental activities and livelihood upgradation/enhancements of theinhabitants. The immense possibilities of development of tourism, of multi-crop cultivationthrough energized withdrawal of ground water (without inviting saline water ingress) and offish preservation and processing could be realised with the availability of grid electricity.236. WBESDCL has already initiated on its own a <strong>project</strong> to connect Sagar island withgrid power available at Kakdwip 33/11 K.V. sub-station via Lot 8 (ckt-I) and GourangaMath (ckt-II) and a crossing over river Muriganga at Harwood point on towers to theproposed Rudranagar 33/11 K.V. sub-station. Works are in various stages oftendering/construction.237. The present component of work under SPR has been proposed so as to reach gridelectricity to the existing and new consumers for 24 hours from the Rudranagar 33/11 K.V.sub-station that is expected to start shortly.238. The work elements will include erection of 488.51 km of 11 K.V. line, 443.00 km ofL & MV line and distribution sub-station (11/0.433 K.V.) – 356 numbers of 25 K.V.A. and265 numbers of 10 K.V.A.Summary statistics related to the proposed <strong>project</strong> are tabulated below:ExpectedConsumers31000 Schools 12 (i) Project cost inRupees in lakhs(ii) Project cost tobe financed inRupees in lakhsDomestic 22906 Panchayet 9 Scheme(other thanSamiti officeimplementationBPL)PeriodDomestic 6094 Hospital/ health 3 Implementing(BPL)centreAuthorityCommercial 1024 Police/outposts 43470.263424.502 yearsWBSEDCL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!