10.07.2015 Views

integrated coastal zone management project west ... - Iczmpwb.org

integrated coastal zone management project west ... - Iczmpwb.org

integrated coastal zone management project west ... - Iczmpwb.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

183Number of (35 cm X 25 cm size) Bag (in<strong>org</strong>anic recyclables): 3380HotelsNumber of Green Bin (<strong>org</strong>anic waste) of 15 litres capacity: 1359Number of Black Bin (in<strong>org</strong>anic non-recyclables) of 15 litres capacity: 1359215. Community bins are to be provided at suitable locations. Each community bin willhave provision for storage of <strong>org</strong>anic and in<strong>org</strong>anic solid waste. Mostly, the street foodvendors will deposit solid waste in the community bins. The street sweeps will be alsodeposited in the community bins216. Street sweeping services are to be provided in the areas where tourists move Theseareas are mostly on the southern side of Foreshore Road, between sea guard wall andForeshore Road. Street sweeping services are also necessary in market places and congestedlocalities of the other southern side of Foreshore Road. Pedal tricycles fitted with containerswill be used for collection and transportations of street sweepings. The size of eachcommunity bin is 1200 mm X 900 m X 800 mm. Each community bin will be divided in totwo equal parts to store <strong>org</strong>anic and in<strong>org</strong>anic waste separately.217. The total number community bins required areOld Digha: 6 Nos.New Digha: 8 Nos.Litter bins are to be placed in suitable locations, especially where tourists move around. It issuggested to provide 50 nos. bins of capacity 10 litres each.Primary Transportation218. Solid waste from all sources initially will be collected and transported by pedaltricycles. The pedal tricycle will contain 6 nos. of 50 litres containers. The total number ofpedal tricycle required for collection of solid wastes from all sources has been estimated at54.Primary Transfer Stations (PTS)219. The town is to be divided in 9 segments. Each segment will have one PrimaryTransfer Station (PTS) as designed. The solid waste will be collected from all sources bypedal tricycles and the waste will be transferred to bigger containers at PTS. The PTS will becomprised of ramp road with elevated platform for unloading solid wastes from pedaltricycles to bigger containers which will be taken thereafter by prime movers to the disposalground. Total number of PTS = 9; Area requirement for each PTS =150 sq. m.Secondary Transportation

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!