integrated coastal zone management project west ... - Iczmpwb.org

integrated coastal zone management project west ... - Iczmpwb.org integrated coastal zone management project west ... - Iczmpwb.org

10.07.2015 Views

178iv. Removal of unauthorized structures and introducing rehabilitationscheme for shop-owners197. There are 1485 number of unauthorized shops dealing with local crafts, food items(fish, cashew etc.).These shops are presently situated along the cross roads joining the ForeShore road and Embankment. The majority of the shops have come into existence near theBlue View Ghat at Old Digha and Kshanika Ghat at New Digha. These shops have beenbuilt up in haphazard manner causing nuisance to the area along the crossroads by dumpedgarbage and creating interference with the easy movement in the area. To get rid of theunsightly situation, it has been decided to shift the shops to Vendors‟ Rehabilitation Centersat three sites identified by DSDA. The 3 sites identified for rehabilitation are planned toaccommodate as many as 620 shops among the 1485 shops during the project phase. Therehabilitation shops have internal dimension of about 3.0 M. X 2.5 M. The plan form of therehabilitation center has been developed to house the individual shops in multiple rows withcommon passages in between the rows. The planning takes into account the requirement offree movement of the people inside the complex for transacting the wares and of findingeasy access from all sides by means of plenty of entry and exit points. Sufficient ventilationand natural lighting have been ensured for providing comfort both to the purchasers andvendors.198. The building will have ceiling height of 3.5 M. from the plinth level covered withtemporary roofing made of tubular trusses covered with GCI sheet membrane. A pitch roofof single span truss has been proposed for convenient disposal of rainwater falling on theroof membrane. Provision of covered drain running along the passage has been made todispose of the rainwater coming from the roof. A false ceiling has been proposed to offer anaesthetically pleasing view to the visitors. Each rehabilitation center will have access fromall abutting roads and will be enclosed with a decorated brick built boundary wall to ensure apleasing and secured environment. Landscape elements along with illuminations have beenprovided within the 3 sites as much as possible to enhance the beauty and aesthetics of thecenters. The entire sites will be covered with interlocking paver tiles for easy movement ofpedestrians. As regards internal electrification, concealed wiring with energy efficientluminaries to provide proper level of illumination in shops and passages, and electric fans inshops as required for displacement of air have been proposed. The main power distributionboard of the complex will receive power from nearest WBSEDCL transformer. Thetechnical specifications are given in the DPR. The component will be implemented byDSDA.Work elements

178iv. Removal of unauthorized structures and introducing rehabilitationscheme for shop-owners197. There are 1485 number of unauthorized shops dealing with local crafts, food items(fish, cashew etc.).These shops are presently situated along the cross roads joining the ForeShore road and Embankment. The majority of the shops have come into existence near theBlue View Ghat at Old Digha and Kshanika Ghat at New Digha. These shops have beenbuilt up in haphazard manner causing nuisance to the area along the crossroads by dumpedgarbage and creating interference with the easy movement in the area. To get rid of theunsightly situation, it has been decided to shift the shops to Vendors‟ Rehabilitation Centersat three sites identified by DSDA. The 3 sites identified for rehabilitation are planned toaccommodate as many as 620 shops among the 1485 shops during the <strong>project</strong> phase. Therehabilitation shops have internal dimension of about 3.0 M. X 2.5 M. The plan form of therehabilitation center has been developed to house the individual shops in multiple rows withcommon passages in between the rows. The planning takes into account the requirement offree movement of the people inside the complex for transacting the wares and of findingeasy access from all sides by means of plenty of entry and exit points. Sufficient ventilationand natural lighting have been ensured for providing comfort both to the purchasers andvendors.198. The building will have ceiling height of 3.5 M. from the plinth level covered withtemporary roofing made of tubular trusses covered with GCI sheet membrane. A pitch roofof single span truss has been proposed for convenient disposal of rainwater falling on theroof membrane. Provision of covered drain running along the passage has been made todispose of the rainwater coming from the roof. A false ceiling has been proposed to offer anaesthetically pleasing view to the visitors. Each rehabilitation center will have access fromall abutting roads and will be enclosed with a decorated brick built boundary wall to ensure apleasing and secured environment. Landscape elements along with illuminations have beenprovided within the 3 sites as much as possible to enhance the beauty and aesthetics of thecenters. The entire sites will be covered with interlocking paver tiles for easy movement ofpedestrians. As regards internal electrification, concealed wiring with energy efficientluminaries to provide proper level of illumination in shops and passages, and electric fans inshops as required for displacement of air have been proposed. The main power distributionboard of the complex will receive power from nearest WBSEDCL transformer. Thetechnical specifications are given in the DPR. The component will be implemented byDSDA.Work elements

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!