integrated coastal zone management project west ... - Iczmpwb.org
integrated coastal zone management project west ... - Iczmpwb.org integrated coastal zone management project west ... - Iczmpwb.org
178iv. Removal of unauthorized structures and introducing rehabilitationscheme for shop-owners197. There are 1485 number of unauthorized shops dealing with local crafts, food items(fish, cashew etc.).These shops are presently situated along the cross roads joining the ForeShore road and Embankment. The majority of the shops have come into existence near theBlue View Ghat at Old Digha and Kshanika Ghat at New Digha. These shops have beenbuilt up in haphazard manner causing nuisance to the area along the crossroads by dumpedgarbage and creating interference with the easy movement in the area. To get rid of theunsightly situation, it has been decided to shift the shops to Vendors‟ Rehabilitation Centersat three sites identified by DSDA. The 3 sites identified for rehabilitation are planned toaccommodate as many as 620 shops among the 1485 shops during the project phase. Therehabilitation shops have internal dimension of about 3.0 M. X 2.5 M. The plan form of therehabilitation center has been developed to house the individual shops in multiple rows withcommon passages in between the rows. The planning takes into account the requirement offree movement of the people inside the complex for transacting the wares and of findingeasy access from all sides by means of plenty of entry and exit points. Sufficient ventilationand natural lighting have been ensured for providing comfort both to the purchasers andvendors.198. The building will have ceiling height of 3.5 M. from the plinth level covered withtemporary roofing made of tubular trusses covered with GCI sheet membrane. A pitch roofof single span truss has been proposed for convenient disposal of rainwater falling on theroof membrane. Provision of covered drain running along the passage has been made todispose of the rainwater coming from the roof. A false ceiling has been proposed to offer anaesthetically pleasing view to the visitors. Each rehabilitation center will have access fromall abutting roads and will be enclosed with a decorated brick built boundary wall to ensure apleasing and secured environment. Landscape elements along with illuminations have beenprovided within the 3 sites as much as possible to enhance the beauty and aesthetics of thecenters. The entire sites will be covered with interlocking paver tiles for easy movement ofpedestrians. As regards internal electrification, concealed wiring with energy efficientluminaries to provide proper level of illumination in shops and passages, and electric fans inshops as required for displacement of air have been proposed. The main power distributionboard of the complex will receive power from nearest WBSEDCL transformer. Thetechnical specifications are given in the DPR. The component will be implemented byDSDA.Work elements
- Page 23 and 24: 2240. The Act is one of the major e
- Page 25 and 26: 24norms. The area up to 200 metres
- Page 27 and 28: 261. No construction to be permitte
- Page 29 and 30: 28survey of flora, fauna, forests a
- Page 31 and 32: 30so far. The major research areas
- Page 33 and 34: 32connected with the Bengal Smoke N
- Page 35 and 36: 34Authority has been given wide ran
- Page 37 and 38: 36technical field staff in biodiver
- Page 39 and 40: 38In RupeesDepartment of GOWBYear20
- Page 41 and 42: 144some sources of residual oil, gr
- Page 43 and 44: 146111. The east coast of India is
- Page 45 and 46: 148Dredging in and around Haldia po
- Page 47 and 48: 150market forces. The average econo
- Page 49 and 50: 152131. The outcome of the importan
- Page 51 and 52: 154STRENGTH WEAKNESS OPPORTUNITIES
- Page 53 and 54: 156B. Project Objectives and Key In
- Page 55 and 56: 158continue to earn their livelihoo
- Page 57 and 58: 160Component A.1 - Prevention of co
- Page 59 and 60: 162meander scrolls, now abandoned,
- Page 61 and 62: 164carried down to Sagar Island by
- Page 63 and 64: 166Dublat the formation of a spit,
- Page 65 and 66: 16827.33 crores having a works cost
- Page 67 and 68: 170180. When plantation are raised
- Page 69 and 70: 172Name of MouzaAdministrativeBlock
- Page 71 and 72: 174F.2 Component B - Pollution prev
- Page 73: 176192. Creation of pay and use toi
- Page 77 and 78: 180203. The suspended sanitary sewe
- Page 79 and 80: 182to be selected. The inorganic no
- Page 81 and 82: 184220. The solid waste will be tra
- Page 83 and 84: 186for implementation at Digha only
- Page 85 and 86: 188Total (excluding cost towards el
- Page 87 and 88: 190and 2 large size (14000 litre) t
- Page 89 and 90: 192To upgrade the existing aquarium
- Page 91 and 92: 194exploit the market facilities of
- Page 93 and 94: 196illumination by providing low he
- Page 95 and 96: 198 dala arcade - consisting of cov
- Page 97 and 98: 200 Utilize the maintenance funds f
- Page 99 and 100: 202carried out in collaboration wit
- Page 101 and 102: 204284. Over the last 150-200 years
- Page 103 and 104: 206BudgetInput / output devices lik
- Page 105 and 106: 208Work Planunderstanding the natur
- Page 107 and 108: 210Sl.NoItem of workTotal Projectco
- Page 109 and 110: 212relevant pilot programmes have b
- Page 111 and 112: 214monitor and evaluate the perform
- Page 113 and 114: 216A.2. Roles and ResponsibilitiesA
- Page 115 and 116: Who will do what?Ecologist/Environm
- Page 117 and 118: 220generally carried out by the mun
- Page 119 and 120: TenureSalaryRecruitment planWho is
- Page 121 and 122: TenureSalaryRecruitmentplanWho is e
- Page 123 and 124: 226Position Technical Assistant I T
178iv. Removal of unauthorized structures and introducing rehabilitationscheme for shop-owners197. There are 1485 number of unauthorized shops dealing with local crafts, food items(fish, cashew etc.).These shops are presently situated along the cross roads joining the ForeShore road and Embankment. The majority of the shops have come into existence near theBlue View Ghat at Old Digha and Kshanika Ghat at New Digha. These shops have beenbuilt up in haphazard manner causing nuisance to the area along the crossroads by dumpedgarbage and creating interference with the easy movement in the area. To get rid of theunsightly situation, it has been decided to shift the shops to Vendors‟ Rehabilitation Centersat three sites identified by DSDA. The 3 sites identified for rehabilitation are planned toaccommodate as many as 620 shops among the 1485 shops during the <strong>project</strong> phase. Therehabilitation shops have internal dimension of about 3.0 M. X 2.5 M. The plan form of therehabilitation center has been developed to house the individual shops in multiple rows withcommon passages in between the rows. The planning takes into account the requirement offree movement of the people inside the complex for transacting the wares and of findingeasy access from all sides by means of plenty of entry and exit points. Sufficient ventilationand natural lighting have been ensured for providing comfort both to the purchasers andvendors.198. The building will have ceiling height of 3.5 M. from the plinth level covered withtemporary roofing made of tubular trusses covered with GCI sheet membrane. A pitch roofof single span truss has been proposed for convenient disposal of rainwater falling on theroof membrane. Provision of covered drain running along the passage has been made todispose of the rainwater coming from the roof. A false ceiling has been proposed to offer anaesthetically pleasing view to the visitors. Each rehabilitation center will have access fromall abutting roads and will be enclosed with a decorated brick built boundary wall to ensure apleasing and secured environment. Landscape elements along with illuminations have beenprovided within the 3 sites as much as possible to enhance the beauty and aesthetics of thecenters. The entire sites will be covered with interlocking paver tiles for easy movement ofpedestrians. As regards internal electrification, concealed wiring with energy efficientluminaries to provide proper level of illumination in shops and passages, and electric fans inshops as required for displacement of air have been proposed. The main power distributionboard of the complex will receive power from nearest WBSEDCL transformer. Thetechnical specifications are given in the DPR. The component will be implemented byDSDA.Work elements