10.07.2015 Views

integrated coastal zone management project west ... - Iczmpwb.org

integrated coastal zone management project west ... - Iczmpwb.org

integrated coastal zone management project west ... - Iczmpwb.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

159To implement a new/modified <strong>coastal</strong> protection plan (both hard and soft) alongDigha-Sankarpur coast based on clear understanding of the <strong>coastal</strong> processes andcauses of <strong>coastal</strong> erosion,To implement an extended and/or modified sewage system of Digha area includinglaying of sewer network, treatment of waste water by oxidation pond method, phytoremediationand disposal of treated waste water,To promote better and sustainable livelihood in Digha Sankarpur <strong>coastal</strong> area throughvalue addition of existing products, better marketing arrangement and developmentof some key infrastructure.To formulate and implement a plan to clean up the area with creation ofinfrastructural facilities like day centre, pay and use toilets, solid waste <strong>management</strong>system etc. for continued clean upkeep of the area,To implement a new or modified protection plan based on clear understanding of theestuarine and <strong>coastal</strong> processes and causes of estuarine and <strong>coastal</strong> erosion at SagarIsland,To promote better and sustainable livelihood in Sagar island area though valueaddition of existing products, better marketing arrangement and development ofsome key infrastructure.To implement construction of a major infrastructure facility, namely extension ofgrid electricity to Sagar Island with transmission line crossing Hugli river andTo identify areas of capacity building and draw up plans of enhancement of capacityof institutions working in <strong>coastal</strong> <strong>zone</strong> <strong>management</strong>.149. As a whole the scope of the entire <strong>project</strong> will be gearedTo identify the factors/activities responsible for depletion and degradation of <strong>coastal</strong>resources and their analysis,To identify the sectors affected by depletion and degradation of <strong>coastal</strong> resources,To formulate sector specific remedial measures for resource depletion/degradationincluding development of alternate livelihood,To identify ecosystem under stress, to analyse its causes and responsible factors andto formulate in applicable cases remedial measures to restore thephysical/chemical/biological characters that were lost/modified/degraded,To identify extent and sectors affected by degradation due to pollution of estuarineand <strong>coastal</strong> environmental quality and to develop sector specific monitoring andmitigation plans including regulatory measures,To formulate a rational utilization plan of <strong>coastal</strong> space for developmental andconservational activities including space to be required for support of livelihood oflocal populace for environmentally, inter-sectorally and socially compatibledevelopment and <strong>management</strong> of the <strong>coastal</strong> <strong>zone</strong> andTo estimate the effects of climate change and its impact on <strong>coastal</strong> infrastructure andlivelihood and to plan for development consistent with the perceived climate changescenario.F. Project Components and Component Description150. As has been stated earlier the <strong>project</strong> proposal takes into account the priority areas ofconcern along the selected stretches of the coast. These concerns could be grouped into threecategories and include the following:F.1 Component A - Problems of <strong>coastal</strong> erosion

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!