182SlNo910Title of thecomponent/subcomponentComponent C.1- Modernisationof MarineAquariumCentre at DighaComponent C.2- Post harvestMajorprogrammeelementspreparation,tenderfloatation,tenderevaluation andaward ofcontractSupervision ofimplementationof theconstructionworkMonitoring andevaluation ofthe efficacy oftheinterventionsPreparation andstudy ofdetailed projectreportPreparation oftenderdocuments forsub schemes tobeimplementedby externalagencies,tenderevaluation andaward ofcontractSupervision ofconstructionworkMonitoring andevaluationabout theefficacy of theinterventionStudy of thedetailed projectYear1 2 3 4 5--- ----- -------- ----- ----- ----- --------------- ------ ----- -------- ----- ----- ----- ---------
183SlNo1112Title of thecomponent/subcomponenthandling andfish auctioncentre at DighaMohanaComponent C.3- Developmentof Eco-tourismin Sagar IslandComponent C.4- EnhancingLivelihoods inMajorprogrammeelementsreportTenderdocumentpreparation,tenderfloatation,tenderevaluation andaward ofcontractConstruction ofthe suggestedconstructionmeasuresMonitoring andevaluation ofthe efficacy oftheinterventionsStudy of thedetailed projectreportTenderdocumentpreparation,tenderfloatation,tenderevaluation andaward ofcontractConstruction ofthe suggestedengineeringmeasuresMonitoring andevaluation ofthe efficacy ofthe proposedinterventionsStudy of theDPR andinitiation ofYear1 2 3 4 5-------- -------- ----- ------------------ -------- ----- ----- ---- ----------
- Page 90 and 91: 193248. A three-storied building ha
- Page 92 and 93: 195underground SW pipes to be laid
- Page 94 and 95: 197 one public change room in betwe
- Page 96 and 97: 199construction of a toilet blockla
- Page 98 and 99: 201Component E.1 - Capacity buildin
- Page 100 and 101: 203Status of surface water resource
- Page 102 and 103: 205Procurement of digital data prod
- Page 104 and 105: 207activity in a mangrove swamp. Ho
- Page 106 and 107: 209299. The project cost has been e
- Page 108 and 109: 211expenditure sanction and payment
- Page 110 and 111: 213ICZMP-WEST BENGAL-Institutional
- Page 112 and 113: 215ICZM Project Management UnitProj
- Page 114 and 115: Who will do what?217332. The specif
- Page 116 and 117: 219333. A website will be set up an
- Page 118 and 119: 221road and water transport facilit
- Page 120 and 121: 223
- Page 122 and 123: TenureSalaryRecruitment planWho is
- Page 124 and 125: 166348. In addition, two Junior Tec
- Page 126 and 127: 168well as the officials of PMU wil
- Page 128 and 129: 170understood and followed by the S
- Page 130 and 131: 172publication of award of contract
- Page 132 and 133: 174evolved in response to the crise
- Page 134 and 135: 176will be at the core of the EMP.
- Page 136 and 137: 178SlNo12Title of thecomponent/subc
- Page 138 and 139: 180SlNo56Title of thecomponent/subc
- Page 142 and 143: 184SlNo13Title of thecomponent/subc
- Page 144 and 145: 186SlNoTitle of thecomponent/subcom
- Page 146 and 147: 188387. A solid data base as part o
- Page 148 and 149: 190stations. Cyclone related data a
- Page 150 and 151: 192 yearly monitoring through field
- Page 152 and 153: 194D2. Program Management Reports40
182SlNo910Title of thecomponent/subcomponentComponent C.1- Modernisationof MarineAquariumCentre at DighaComponent C.2- Post harvestMajorprogrammeelementspreparation,tenderfloatation,tenderevaluation andaward ofcontractSupervision ofimplementationof theconstructionworkMonitoring andevaluation ofthe efficacy oftheinterventionsPreparation andstudy ofdetailed <strong>project</strong>reportPreparation oftenderdocuments forsub schemes tobeimplementedby externalagencies,tenderevaluation andaward ofcontractSupervision ofconstructionworkMonitoring andevaluationabout theefficacy of theinterventionStudy of thedetailed <strong>project</strong>Year1 2 3 4 5--- ----- -------- ----- ----- ----- --------------- ------ ----- -------- ----- ----- ----- ---------