- Page 1 and 2: INTEGRATED COASTALZONE MANAGEMENTPR
- Page 3: 2INTEGRATED COASTAL ZONE MANAGEMENT
- Page 9 and 10: 84. Agriculture is the major occupa
- Page 11: 10volume of sediment carried by the
- Page 15 and 16: 14Biosphere Reserve by UNESCO in 20
- Page 17 and 18: 16Plotosus canius, Pompus argenteus
- Page 19 and 20: 18huge Ganges catchment. Pollution
- Page 21 and 22: 20Bengal. The port handles over 28
- Page 23 and 24: 2240. The Act is one of the major e
- Page 25 and 26: 24norms. The area up to 200 metres
- Page 27 and 28: 261. No construction to be permitte
- Page 29 and 30: 28survey of flora, fauna, forests a
- Page 31 and 32: 30so far. The major research areas
- Page 33 and 34: 32connected with the Bengal Smoke N
- Page 35 and 36: 34Authority has been given wide ran
- Page 37 and 38: 36technical field staff in biodiver
- Page 39 and 40: 38In RupeesDepartment of GOWBYear20
- Page 41 and 42: 144some sources of residual oil, gr
- Page 43 and 44: 146111. The east coast of India is
- Page 45 and 46: 148Dredging in and around Haldia po
- Page 47 and 48: 150market forces. The average econo
- Page 49 and 50: 152131. The outcome of the importan
- Page 51 and 52: 154STRENGTH WEAKNESS OPPORTUNITIES
- Page 53 and 54: 156B. Project Objectives and Key In
- Page 55 and 56: 158continue to earn their livelihoo
- Page 57 and 58: 160Component A.1 - Prevention of co
- Page 59 and 60: 162meander scrolls, now abandoned,
- Page 61 and 62: 164carried down to Sagar Island by
- Page 63 and 64:
166Dublat the formation of a spit,
- Page 65 and 66:
16827.33 crores having a works cost
- Page 67 and 68:
170180. When plantation are raised
- Page 69 and 70:
172Name of MouzaAdministrativeBlock
- Page 71 and 72:
174F.2 Component B - Pollution prev
- Page 73:
176192. Creation of pay and use toi
- Page 76 and 77:
179199. The work elements to arrive
- Page 78 and 79:
181environmental pollution goes una
- Page 80 and 81:
183Number of (35 cm X 25 cm size) B
- Page 82 and 83:
185Litter bins - 10 litres capacity
- Page 84 and 85:
187indirectly to the Bay of Bengal
- Page 86 and 87:
189Agricultural 120 Water works 10S
- Page 88 and 89:
191243. The following tanks will be
- Page 90 and 91:
193248. A three-storied building ha
- Page 92 and 93:
195underground SW pipes to be laid
- Page 94 and 95:
197 one public change room in betwe
- Page 96 and 97:
199construction of a toilet blockla
- Page 98 and 99:
201Component E.1 - Capacity buildin
- Page 100 and 101:
203Status of surface water resource
- Page 102 and 103:
205Procurement of digital data prod
- Page 104 and 105:
207activity in a mangrove swamp. Ho
- Page 106 and 107:
209299. The project cost has been e
- Page 108 and 109:
211expenditure sanction and payment
- Page 110 and 111:
213ICZMP-WEST BENGAL-Institutional
- Page 112 and 113:
215ICZM Project Management UnitProj
- Page 114 and 115:
Who will do what?217332. The specif
- Page 116 and 117:
219333. A website will be set up an
- Page 118 and 119:
221road and water transport facilit
- Page 120 and 121:
223
- Page 122 and 123:
TenureSalaryRecruitment planWho is
- Page 124 and 125:
166348. In addition, two Junior Tec
- Page 126 and 127:
168well as the officials of PMU wil
- Page 128 and 129:
170understood and followed by the S
- Page 130 and 131:
172publication of award of contract
- Page 132 and 133:
174evolved in response to the crise
- Page 134 and 135:
176will be at the core of the EMP.
- Page 136 and 137:
178SlNo12Title of thecomponent/subc
- Page 138 and 139:
180SlNo56Title of thecomponent/subc
- Page 140 and 141:
182SlNo910Title of thecomponent/sub
- Page 142 and 143:
184SlNo13Title of thecomponent/subc
- Page 144 and 145:
186SlNoTitle of thecomponent/subcom
- Page 146 and 147:
188387. A solid data base as part o
- Page 148 and 149:
190stations. Cyclone related data a
- Page 150 and 151:
192 yearly monitoring through field
- Page 152 and 153:
194D2. Program Management Reports40