221road and water transport facility for convenient marketing of agricultural produce, trainingand awareness campaign for livelihood options, etc. SIDCL will also facilitateimplementation of the Eco-tourism project in Sagar Island involving quality civilconstructions.Zoological Survey of India342. ZSI maintains a marine aquarium in Digha that now require modernisation andrenovation. The responsibility of ZSI will be to draw up a DPR identifying the workcomponents, invite tender, select the vendor and supervise the work of the company awardedthe work. All actions will follow the standing rules of the Central Government.Forest Directorate, Government of West Bengal343. High velocity wind along the coastal areas causes much physical damage of humanhabitation and agricultural crops. Bioshields, or vegetative cover, along coastal zones play asignificant role in shore protection and also in protection of the coastal habitations againstGOWB will be to create coastal bioshields in the Digha Sankarpur area on government landas part of ICZM project. The Directorate will raise and maintain appropriate plantation in anarea of 700 hectares following the departmental norms of expenditure over a five year period.Institute of Environmental Studies and Wetland Management344. IESWM will be responsible for the preparation of ICZMP of West Bengal. Based onthe data input from pilot projects as well as its own research on all aspects of coastalprocesses and socio-economics of the region the ICZMP will be prepared by IESWM. TheInstitute will play the role of a catalyst in mobilising coastal zone research having a bearingon ICZMP and will be responsible to build the base of form-process-material-biologysocioeconomicinteraction model on which the ICZMP will stand.345 As part of capacity building of IESWM, facility augmentation of the existing RemoteSensing & GIS laboratory, creation of computing facilities for climate change studies alongwith overseas training of scientists, procurement of advanced coastal process monitoringequipments have been proposed. The responsibility of IESWM in this capacity building effortwill be to procure the right instrument following the laid down procedures in government,install and calibrate them, keep them in running condition and to ensure generation of qualitydate adequately.University of Calcutta346. The project on Capacity Building of Calcutta University is mainly gearedtowards procurement and installation of some advanced instruments as a part of
TenureSalaryRecruitment planWho is eligiblePosition222capacity building of the participating departments (Biochemistry, Microbiology,Agriculture, Environmental Science, Atmospheric Science) of CalcuttaUniversity. The installed instruments will be used for undertaking two researchprograms – one on deciphering the microbial diversity of soil and water ofSundarbans in West Bengal and the other mainly on measurement of CO 2sequestration, CH 4 emission, estimation of different components, nutrients,primary productivity of water in the Sundarbans mangrove forest.A.3 Staffing Plan347. Staffing plan for Project Management Unit (PMU) is given in the following Tables.Project DirectorProgram Manager- OperationProgramManager-Finance andAdministrationProgram Manager-Documentation &CommunicationShould haveminimum 20years ofservice/experiencein the relevantfield.Should have minimum of 15 yearsof service/experience in therelevant field.Should haveminimum of 15years of service/experience inthe relevantfield.Should have minimum of15 years of service/experience in the relevantfield.Should haveexperience oncoastal zonemanagement/environmentalmanagement/coastal marineresourcemanagementShould have sound technicalknowledge on coastal zonemanagement issues/environmental managementissues.Should haveknowledge onFinancialmanagementand generaladministrationShould have knowledgeand experience in MassCommunication/Documentation (incomputer) preferably oncoastalmanagement/environmentalmanagement issuesRecruitment to the above four positions will be either through deputation basis or through openadvertisement.Rs. 50,000/- p.m. Rs. 40,000/- p.m. Rs. 40,000/-p.m.Rs. 40,000/- p.m.Tenure of all positions is for a period of five years and is purely temporary. However, the continuation willbe subject to annual review.
- Page 67 and 68: 170180. When plantation are raised
- Page 69 and 70: 172Name of MouzaAdministrativeBlock
- Page 71 and 72: 174F.2 Component B - Pollution prev
- Page 73: 176192. Creation of pay and use toi
- Page 76 and 77: 179199. The work elements to arrive
- Page 78 and 79: 181environmental pollution goes una
- Page 80 and 81: 183Number of (35 cm X 25 cm size) B
- Page 82 and 83: 185Litter bins - 10 litres capacity
- Page 84 and 85: 187indirectly to the Bay of Bengal
- Page 86 and 87: 189Agricultural 120 Water works 10S
- Page 88 and 89: 191243. The following tanks will be
- Page 90 and 91: 193248. A three-storied building ha
- Page 92 and 93: 195underground SW pipes to be laid
- Page 94 and 95: 197 one public change room in betwe
- Page 96 and 97: 199construction of a toilet blockla
- Page 98 and 99: 201Component E.1 - Capacity buildin
- Page 100 and 101: 203Status of surface water resource
- Page 102 and 103: 205Procurement of digital data prod
- Page 104 and 105: 207activity in a mangrove swamp. Ho
- Page 106 and 107: 209299. The project cost has been e
- Page 108 and 109: 211expenditure sanction and payment
- Page 110 and 111: 213ICZMP-WEST BENGAL-Institutional
- Page 112 and 113: 215ICZM Project Management UnitProj
- Page 114 and 115: Who will do what?217332. The specif
- Page 116 and 117: 219333. A website will be set up an
- Page 120 and 121: 223
- Page 122 and 123: TenureSalaryRecruitment planWho is
- Page 124 and 125: 166348. In addition, two Junior Tec
- Page 126 and 127: 168well as the officials of PMU wil
- Page 128 and 129: 170understood and followed by the S
- Page 130 and 131: 172publication of award of contract
- Page 132 and 133: 174evolved in response to the crise
- Page 134 and 135: 176will be at the core of the EMP.
- Page 136 and 137: 178SlNo12Title of thecomponent/subc
- Page 138 and 139: 180SlNo56Title of thecomponent/subc
- Page 140 and 141: 182SlNo910Title of thecomponent/sub
- Page 142 and 143: 184SlNo13Title of thecomponent/subc
- Page 144 and 145: 186SlNoTitle of thecomponent/subcom
- Page 146 and 147: 188387. A solid data base as part o
- Page 148 and 149: 190stations. Cyclone related data a
- Page 150 and 151: 192 yearly monitoring through field
- Page 152 and 153: 194D2. Program Management Reports40
TenureSalaryRecruitment planWho is eligiblePosition222capacity building of the participating departments (Biochemistry, Microbiology,Agriculture, Environmental Science, Atmospheric Science) of CalcuttaUniversity. The installed instruments will be used for undertaking two researchprograms – one on deciphering the microbial diversity of soil and water ofSundarbans in West Bengal and the other mainly on measurement of CO 2sequestration, CH 4 emission, estimation of different components, nutrients,primary productivity of water in the Sundarbans mangrove forest.A.3 Staffing Plan347. Staffing plan for Project Management Unit (PMU) is given in the following Tables.Project DirectorProgram Manager- OperationProgramManager-Finance andAdministrationProgram Manager-Documentation &CommunicationShould haveminimum 20years ofservice/experiencein the relevantfield.Should have minimum of 15 yearsof service/experience in therelevant field.Should haveminimum of 15years of service/experience inthe relevantfield.Should have minimum of15 years of service/experience in the relevantfield.Should haveexperience on<strong>coastal</strong> <strong>zone</strong><strong>management</strong>/environmental<strong>management</strong>/<strong>coastal</strong> marineresource<strong>management</strong>Should have sound technicalknowledge on <strong>coastal</strong> <strong>zone</strong><strong>management</strong> issues/environmental <strong>management</strong>issues.Should haveknowledge onFinancial<strong>management</strong>and generaladministrationShould have knowledgeand experience in MassCommunication/Documentation (incomputer) preferably on<strong>coastal</strong><strong>management</strong>/environmental<strong>management</strong> issuesRecruitment to the above four positions will be either through deputation basis or through openadvertisement.Rs. 50,000/- p.m. Rs. 40,000/- p.m. Rs. 40,000/-p.m.Rs. 40,000/- p.m.Tenure of all positions is for a period of five years and is purely temporary. However, the continuation willbe subject to annual review.