10.07.2015 Views

integrated coastal zone management project west ... - Iczmpwb.org

integrated coastal zone management project west ... - Iczmpwb.org

integrated coastal zone management project west ... - Iczmpwb.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

220generally carried out by the municipal authorities and therefore DSDA has been assigned this<strong>project</strong> so as to keep the Digha beach clean for everyone to enjoy.Public Health Engineering Directorate, Government of West Bengal338. PHED is one of the important engineering departments of Government of WestBengal that has done commendable work in providing safe drinking water to the ruralpopulation of West Bengal. They are also instrumental in providing basic sanitation needs innon-municipal areas. In the Digha area because of growing population, large urban touristinflux and construction of hotels and restaurants the problems of sanitation related waste<strong>management</strong> and treatment including construction of a sanitary landfill along with vermicompositingfacility, construction of underground sewer lines and a sewage treatment facilityare required to be addressed. Accordingly PHED will take up the related construction work aspilots <strong>project</strong> under ICZM. The Department will prepare the detailed <strong>project</strong> report with biddocuments including the required drawings and BOQ, evaluate the tenders, select the vendor,issue work order, sign the contract, supervise the construction work and release payment tothe contractor as per measurement at agreed rates.West Bengal State Electricity Distribution Company Limited339. WBESDCL, the only company other than CESC engaged in distribution of electricpower in West Bengal, plans to provide grid electricity to the residents of Sagar Island as partof ICZM so that there is a quantum jump in improving quality of life of the local people. TheCompany proposes to bring power line by crossing the Hugli river through towers. Thepreliminary design report has already been prepared by the Company. The Department willprepare the detailed <strong>project</strong> report with bid documents including the required drawings andBOQ, evaluate the tenders, select the vendor, issue work order, sign the contract, supervisethe construction work and release payment to the contractor as per measurement at agreedrates. A revenue model for collection of charges on account of electricity drawn by theconsumers will also be worked out by the Company.West Bengal Fisheries Development Corporation Ltd340. The WBFDCL will execute the construction of the proposed fish auction centre atDigha l man power providing a modern and eco-friendly facility complaint with public healthnormsSundarban Infra-structure Development Corporation Ltd341. SIDCL will execute Sundarban specific pilot programs of ICZM having a directbearing on improved livelihood in the Sundarban areas. These will include construction ofinfrastructural facilities related to various aspects of agriculture, construction of improved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!