10.07.2015 Views

43-101 2009 Technical Report On The San Antonio Project, Baja ...

43-101 2009 Technical Report On The San Antonio Project, Baja ...

43-101 2009 Technical Report On The San Antonio Project, Baja ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PEDIMENT GOLD CORP.6.4. Wallis (RPA 2004)<strong>The</strong> Cirio and Emily concessions were the subject of an independent technical report byStewart Wallis, P.Geo. of RPA Associates in June 2004. His report, which described manyof the properties in Mexico held by Minera Pitalla, was written at the request of SkinnyTechnologies Inc. that is the predecessor company to Pediment. <strong>The</strong> report included a fieldreview of Las Colinas which included sample collection. He did not verify the database butnoted that “the EBX interpretation extended the mineralization on most sections no morethan100 m from a drill hole intercept”. He also noted that “approximately 15% of thedeposit lay on the adjoining Texcalama Concession to the south that was not owned byPitalla”. More recent technical reports by Thompson and Giroux considered resources onlylocated within the Cirio concession owned by Pitalla.Wallis reported that “<strong>The</strong> early mining in both districts was focused on oxidized highsulphide,high-grade gold-silver veins ranging in width of up to 3 m, with strike lengths ofnearly 2 km”.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!